REINFORCING STEEL PLACEMENT
Report Date: November 1,2013 Test Date: October 23,2013
Client: City of Coppell Report No.: 7
Project Creekview Drive Roadway Improvements Project No.: 213-0134
Identification Reinforcing Steel Observation
Method of Test Visual Observation Page 1 of 1
Results
On October 23,2013 reinforcing steel was observed at the following location:
Nortliside Sidewalk/Railing Footing
•
The following discrepancies were noted and called to the attention of Brian,a representative of The
Fain Group:
•
1. West 80 feet of bars doweled into sidewalk were not epoxied.
The above discrepancies were corrected as noted.
Technician: RG
cc: Mr.Larry Davis-City of Coppell,Phone:972-304-3684;via Fax:972-304-3570.
Mr.George Marshall-City of.Coppell,Phone:972-304-3562;via E-mail:gMarshall @coppelltx.gov
Mr.Rod Lacy-The Fain Group,Phone: 817-927-4388;via E-mail:rlacy @faingp.com
Texas CMT,Inc. TBPE Firm: F-4521 Reviewed by: