Loading...
DR1201-LR131101 (3) NOV-03-2013 23:33 P.15/15 Texas CMT, Inc. ATA Construction Materials Testing GEE Consultants, Inc. and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com • REINFORCING STEEL PLACEMENT Report Date: November 1,2013 Test Date: October 23,2013 Client: City of Coppell Report No.: 7 Project Creekview Drive Roadway Improvements Project No.: 213-0134 Identification Reinforcing Steel Observation Method of Test Visual Observation Page 1 of 1 Results On October 23,2013 reinforcing steel was observed at the following location: Nortliside Sidewalk/Railing Footing • The following discrepancies were noted and called to the attention of Brian,a representative of The Fain Group: • 1. West 80 feet of bars doweled into sidewalk were not epoxied. The above discrepancies were corrected as noted. Technician: RG cc: Mr.Larry Davis-City of Coppell,Phone:972-304-3684;via Fax:972-304-3570. Mr.George Marshall-City of.Coppell,Phone:972-304-3562;via E-mail:gMarshall @coppelltx.gov Mr.Rod Lacy-The Fain Group,Phone: 817-927-4388;via E-mail:rlacy @faingp.com Texas CMT,Inc. TBPE Firm: F-4521 Reviewed by: letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and axe not necessarily indicative of the quantities of apparently identical or similar products. TOTAL P.15