DR1201-CR131103 T H E • C 1 T Y O F
COPPELL
0
x A s ' a 9 DAILY CONSTRUCTION REPORT
PROJECT: CREEKVIEW DR RETAINING 1 f 1 y�
WALL&ROADWAY DATE !I / +i$ REPORT#
IMPROVEMENTS DAY M IT W IT F 101S
PROJECT NO. DR 12-01
WEATHER SUN C OVERCAST RAIN SNOW
OWNER: CITY of COPPELL TEMP To 32 -50-70 70-85 85 up
WIND Mod High Overtime Form
CONTRACTOR: FAIN GROUP HUMIDITY idg. Mod Humid Submitted? Y /N
PROJECT INSP: LARRY DAVIS
AVERAGE FIELD FORCE
NAME OF NON-MANUAL MANUAL REMARKS
CONTRACTOR/SUBCONTRACTOR
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES: rt��
1N0 r` ;YI art 51ti 'K lea 1 J Sa�1 f 5I/'�+.'
Gvf g e t- P'
ttSIGNATURE
ENGINEERING INSPECTOR