Loading...
CF-Cozby Library-LR 940523 (3) E GEE Consultants, Inc. F 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: May 23, 1994 Date Cnncrete Placed: April 22, 1994 Standard 6"x12' Client: City of Coppell Area 28.27 Square Inches Project: W.T. Cozby Public Library Contm,'tor: Diversified Construction Services, Inc. Concrete Supplier and Plant: Texas Industries, Inc. - Plant #41 Location of Placement: Pier s MATERIALS s,~,~: ~o s.,~w~. INSPECTION DATA Deacrlp6~n (Ll~CuYd~ Mix Number: 8203 Time Sample Batched: 10:52 am Cement: Time Sampled: I 1:45 am Fly Ash: Sample Lo~:ation: B-t2 Truck,"ricket No: 83/210975 Coarse Aggregate: I'C.S. Temperature: Intermediate Aggregate: Ambient Range: 84°F Fine Aggregate: Concrete Range: 82°F Admixtures: Slump Rang-' (inches]: Weather Conditions: Clear I ADMIX/AEA Time Started: N/A 2 Time Completed: N/A Added Water: Sample Air Content (%): No Test Total Cubic Yards Placed: 10.0 Required Strength (Lbs/4. n.) 3,000 Sgecir~n Measured Ag~ Date Tc~,ai Load C~p~sive Stm~ ~t~ N~r SI~ :~.1 ~)31 Tes~ ;L~,I ~. ~.ln.~ WTC 16 5~ 7 04/29/94 69,680 2,460 WTC 17 5~ 7 04/29/94 67,060 2,370 WTC 18 5~ 28 05/20/94 112,760 3,990 WTC 19 5~ 28 05/20/94 111,540 3,950 WTC 20 5% Hold T~t Me~ Util~ F~ ~g~r Cylinders Made By: V. M. A~M C-31 ,C-39.C- [ 43 : I.'~ N~ O~i~ ~ Remarks and/or Distribution: cc: Gary Sieb - City of Coppell Mike Sherpinskas - Diversified Construction Services, Inc. Jim Bullock - F & S Partners Russell Williams - Brockette Davis Drake, Inc. ~' ~, // Gg ~nsult~ts, Inc. Rev,ewed by: