DR1201-CR131031 T N ôhEIi
° s DAILY CONSTRUCTION REPORT
PROJECT: CREEKVIEW DR RETAINING �j
WALL&ROADWAY DATE j 1) /o PORT#
IMPROVEMENTS / r
DAY M 1T 1 101 S S
PROJECT NO. DR 12-01
WEATHER SUN OVERCAST RAIN SNOW
OWNER: CITY of COPPELL TEMP To 32 32-50 50-70 85 up
WIND Still High Overtime Form
CONTRACTOR: FAIN GROUP HUMIDITY Dry Humid Submitted? Y /N
PROJECT INSP: LARRY DAVIS
AVERAGE FIELD FORCE
NAME OF NON-MANUAL MANUAL REMARKS
CONTRACTOR/SUBCONTRACTOR
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
Pa ukhtic
SIGNATURE
ENGINEERING INSPECTOR