MA1009-CS130418 Rhonda Adloo From:Kyle Dykes <KDykes@TNPINC.com> Sent:Thursday, April 18, 2013 3:08 PM To:Keith Marvin; John Elias Cc:Tim May; Alberto Samaniego; Michael Arellano Subject:RE: Retaining Wall Block I think this sounds like a good idea. Kyle Dykes, P.E., CFM StormWaterGroup 1100 Macon Street Fort Worth, Texas 76102 817.336.5773 Main 817.665.7171 Direct kdykes@tnpinc.com From: Steve Kenney [mailto:steve@jdkassoc.com] Sent: Thursday, April 18, 2013 3:03 PM To: kmarvin@coppelltx.gov; Kyle Dykes; jelias@coppelltx.gov; Tim May; asamaniego@coppelltx.gov; marellano@coppelltx.gov Subject: Retaining Wall Block Gentlemen, We are requesting to only use the 18”W X 12”L X 8”T unit in the first three courses below grade. In doing so, we would create a credit back to the city in between$ 5-7000.00 dollars for this project. Our reasoning is that utilizing the more expensive three piece system block below grade is neither productive nor cost effective. Please respond at your earliest convenience. Thank you, Thanks, James (Steve). Kenney President JDK Associates, Inc. 940-686-6236 940-686-6318 1 Rhonda Adloo From:Kyle Dykes <KDykes@TNPINC.com> Sent:Thursday, April 18, 2013 3:11 PM To:Steve Kenney Cc:Keith Marvin; Alberto Samaniego; Tim May; John Elias; Michael Arellano Subject:RE: GeoWeb Steve, The intent is for the Geoweb to remain at a constant elevation in which the normal pool is equal to the grade brake in the Geoweb. The protected slope would only move away from the trail (2 to 4 feet) as needed to makeup grade at 4:1. Feel free to call to discuss the intent of the detail. Thanks Kyle Dykes, P.E., CFM StormWaterGroup 1100 Macon Street Fort Worth, Texas 76102 817.336.5773 Main 817.665.7171 Direct kdykes@tnpinc.com From: Steve Kenney [mailto:steve@jdkassoc.com] Sent: Thursday, April 18, 2013 11:52 AM To: Kyle Dykes Cc: kmarvin@coppelltx.gov; asamaniego@coppelltx.gov; Tim May; jelias@coppelltx.gov; marellano@coppelltx.gov Subject: RE: GeoWeb Gentleman, For the most part this will work but my concerns are if we move out the additional 2-4 feet we will be below the 446.50 water level. I am on my way out to the job and will verify grades and get back with you. Thanks, James (Steve). Kenney President JDK Associates, Inc. 940-686-6236 940-686-6318 From: Kyle Dykes [mailto:KDykes@TNPINC.com] Sent: Wednesday, April 17, 2013 3:52 PM To: Steve Kenney Cc: kmarvin@coppelltx.gov; asamaniego@coppelltx.gov; Tim May; jelias@coppelltx.gov; marellano@coppelltx.gov Subject: RE: GeoWeb Steve, 1 The attached sketch shows a revised typical section for the Geoweb installation. The existing ground is shown to scale for the area where we met onsite yesterday. The overall length of the 4:1 slope will vary slightly depending on the elevation of the trail. Let me know if you have any questions. Additional information will follow regarding:  Lake outfall elevation  Fishing Pier sleeves  Headwalls  Bridge decking Kyle Dykes, P.E., CFM StormWaterGroup 1100 Macon Street Fort Worth, Texas 76102 817.336.5773 Main 817.665.7171 Direct kdykes@tnpinc.com From: Steve Kenney [mailto:steve@jdkassoc.com] Sent: Wednesday, April 17, 2013 3:15 PM To: Kyle Dykes Cc: kmarvin@coppelltx.gov; asamaniego@coppelltx.gov; Tim May; jelias@coppelltx.gov; marellano@coppelltx.gov Subject: RE: GeoWeb Gentlemen, Do we have a solution yet? Thanks, James (Steve). Kenney President JDK Associates, Inc. 940-686-6236 940-686-6318 From: Kyle Dykes [mailto:KDykes@TNPINC.com] Sent: Tuesday, April 16, 2013 2:44 PM To: Steve Kenney Cc: kmarvin@coppelltx.gov; asamaniego@coppelltx.gov; Tim May; jelias@coppelltx.gov; marellano@coppelltx.gov Subject: RE: GeoWeb I am working on a more thorough evaluation of this issue and will respond ASAP…no later than tomorrow. 2 Kyle Dykes, P.E., CFM StormWaterGroup 1100 Macon Street Fort Worth, Texas 76102 817.336.5773 Main 817.665.7171 Direct kdykes@tnpinc.com From: Steve Kenney [mailto:steve@jdkassoc.com] Sent: Tuesday, April 16, 2013 2:11 PM To: kmarvin@coppelltx.gov; Kyle Dykes; asamaniego@coppelltx.gov; Tim May; jelias@coppelltx.gov; marellano@coppelltx.gov Subject: GeoWeb Gentlemen, After our meeting today we took some grades around the edge of the lake to verify what the existing grades were at the edge of the water. We found that the existing ground is at the 445.50 one foot below water. If we are to move out an additional 5 feet, the geoweb will be anywhere from 2-2.5 below the 446.50 water level. It is my suggestion after meeting with the geoweb sales rep that we maintain the 7 to 1 for the first 8 feet, and the second 8 feet to 4-1 or whatever the existing conditions dictate. Please respond at your earliest convenience. Thank you, Thanks, James (Steve). Kenney President JDK Associates, Inc. 940-686-6236 940-686-6318 3