Loading...
MA1009-CS130409 Rhonda Adloo From:Kyle Dykes <KDykes@TNPINC.com> Sent:Tuesday, April 09, 2013 5:34 PM To:Keith Marvin Subject:Andy Brown & Alex Canal - Testing Keith, Per our phone call, here are a few thoughts that may help scope the testing.  Structural backfill should be free draining.  Structural backfill should have some bonding strength (don’t get too dry or too lean)…even 500 or 1000 psi should be sufficient.  The specs call for one cylinder every 100 lf of wall, for each lift (this frequency is intended to have one test per truck load approximately).  Creating a solid footing is key. Kyle Dykes, P.E., CFM StormWaterGroup 1100 Macon Street Fort Worth, Texas 76102 817.336.5773 Main 817.665.7171 Direct kdykes@tnpinc.com 1