Loading...
Trail System-CS090325Rhonda Adloo From: John Elias Sent: Wednesday, March 25, 2009 10:49 AM To: Keith Marvin Subject: Fwd: Trails Master Plan - Creekview Bethel Attachments: D08709 - Coppell 20090310 llxl7.pdf, Coppell - April 2 Presentation.doc Keith, Please read the underlined portion of this email and have a look at the PDF attached. We need to discuss easements or lack of easements. I'll call you to explain in more detail. John Brad -John, Trails Master Plan Just wanted to give you an update on the Trails Masterplan. We have had meetings with the City of Irving on conncetioning to the Campion Trail. The Irving City Manager has asked the Parks Department to complete the last 14 miles of the Campion Trail within the next three years. This means the trail will extend into Sam Houtson Park and run unto the top of the levee into a residential neighborhood and make a connection to Cimmaron Park. This will place the trail within 1400' of the south side of Coppell. Today I meet with Scott Whitker from the City of Carrollton. Carrollton is focused on connecting there east side of town to the new DART rail line and have placed any trails on the west of town on the back burner. Currently they have a regional trail proposed on the east side of the Elm Fork Branch of the Trinity that runs through there regional park at Sandy Lake Road. Scott said it would be 5 to 10 years before this trail is constructed. This trail would parrellal the Campion trail south of Betl Line Road so Carrollton may want to partner with you and Irving to one day make this connection. Lewisville has asked that we corridinate with Lenny Hughs at Hallff Associates and have placed 2 calls into them asking for a meeting. I have not heard from The Town of Flower Mound and Doug Evans with Grapevine is out until next week. I hope to have all these meetings completed within the 7 days. We have attached a new graphic that shows the following: Exisitng on- street trails Exisitng Trails - off street / park Proposed Trial (under roadway construction) Proposed Trail (Requesting Easement Informaiton) If possible I would like to schedule a meeting next week or the following so Jeff or James can sit down with Keith Marvin (Engineering Department) and confirm if we need easements to help make this plan real. I also have attached an outline for the workshop on April 2nd, please review and lets talk this week if you feel this is the correct direction. Creekview - Bethel Trail Would like to schedule a time next Thursday or Friday to review the conceptual layout of the trail. Please let me know when you are open. Regards, Mark Mark Meyer, RLA Principal Austin . Dallas . Houston . San Antonio TEL 214.744.0757 FAX 214.744.6785 www.tbg- inc.com <http: / /www.tbg- inc.com /> This e -mail and any attachments contain confidential and privileged information. If you are NOT the intended recipient, please notify the sender promptly by return e-mail and delete this message and any attachments. Any action taken with this message by persons other than the intended recipient is prohibited. By the use of any attachment, the intended recipient accepts all risks associated with such use, including unintended electronic viruses and will indemnify TBG Partners from any claim of damage arising from use or transfer of the attachment. All content and attachments to this email are copyrighted, and unauthorized use is prohibited. P Please consider the environment before printing this email. City of Coppell Trails Master Plan — Workshop (Connections) Presentation Date 04.02.2009 Location: City Hall Time: 7:00 -9:00 Attendees: entire city or by invite ? ?? A. Introduction 1. Purpose 2. Guiding Principals and Goals 3. Planning Process (Methodology) 4. Previous Trail Recommendations a. Implementation of Plan b. Timeframe 5. Types of Trail Users B. The City of Coppell 1. History and Facts 2. Major Destinations and Attractions 3. Demographics a. Current b. Future Projections 4. Previous Trail Recommendations a. Implementation of Plan b. Timeframe 5. Users of the Trails C. Community Involvement& Input D. Hike and Bike Trail Opportunities 1. Identification and Evaluation of Citywide Opportunities f Trail Corridor Ana /ysis & Prioritization 1. Recommended Trails 2. Trail Prioritization 3. Major Highway or Barrier Crossings or Environmental Crossings F Trai /Design Standards & 6uidelines 1. Trail Types 5307 E. Mockingbird, Suite 300, Dallas, Texas 75206 TEL 214.744.0757 FAX 214.744.6785 WEB www.tbg- inc.com Addressee's Name July 12, 2004 2. Trail Design Standards 3. Trail Features G City of Coppeii Trails Master Plan 1. Trail Master Plan Addressee's Name July 12, 2004 H. Implementation Strategies and References 1. Funding Sources 2. Implementation Timeframe 3. Trail Implementation Process 4. References FLOWER MOUND DEN rON COUP: r'i TARRANT COUNTY. /! LEWISVILLE �- -- N ,�►�, �" -" I DEN70N COUNTY DALLAS €:000N 1 1 • I _ - � ,rte - „_;_ '� ,' ;- ",�, " "• _' �.' o: - r CITYoF,,cA,RROL�T ®N REGIONAL {TRAIL k - SANDY LAN[ RD ff ri r1i CITYOF GRAPEVINE 111 s. +E�PPELL "TT J i J REGIONAL TRAIL - � i �j • � � Qil idi � ^ r ::I"Y I . �I I i ( iJ `7' r .{- CREEI(ViEW DR r. N ...wv = E ^r E l - i It ,a / t ' 1 is - ' SET - � � h E GRAPEVINE f GIr y l A _ a _ _ - ` • - CARROLLTON - _ - dm ci6t, ►. li IWO"- y DALLAS LEGEN❑ Sea EXISTING ON- STREET TRAIL Icr I + EXISTING TRAIL - OFF- STREETIPARK �. PROPOSED TRAIL p{ �r T �,iF, 1 :