CF-Cozby Library-LR 940520 (06)J G EOTECHNICAL
E GEE Consultants, Inc.
2540 Glenda Lane · Suite 105 · Dallas, lexas 75229 · (214) 620-9791 · [ax (214) 620-~794
REPORT OF CONCRETE MIX INSPECTION
Report Date: May 20, 1994 Date Concrete Placed: April 25, 1994 Standard 6'x12'
Client: City of Coppell Area 28.27 Square Inches
Project: W.T. Cozby Public Library
Contractor: Diversified Construction Services, Inc.
Concrete Suppl{¢r and Plant: Texas Industries, Inc. - Plant #31
Location of Placement: P i e r s
MATERIALS ~ ~D s,,~w~,. INSPECTION DATA
Deactip6on (Lb~.'CuYdl
Mix Number: 8203 Time Sample Batched: 10:02 am
Cement: Time Sampled: 11:30 am
Sample Location: J-10
Fly Ash: Truck;Ticket No: 420/211560
Coarse Aggregate: I'C.S. Temperature:
Intermediate Aggregate: Ambient Range: 76°F
Fine Aggregate: Concrete Range: 75°F
Admixtures: Slump Range (inches): 4t~
Weather Condition.s: Cloudy
I ADM LX:'AEA Time Started: N/A
2 Time Completed: N!A
Added Water: Sample Air Content (,%): No Test
Total Cubic Yards Placed: 10.0
Required Strength (Lbs.!sq.ln.): 3,000
S.v~'imen Measxu~l A~ Date Tetal Load C~si~ St~
N~r Sl~p ib.~ (~ys; T~ fL~.) (~.-'~.b.~
WTC 21 4~ 24 05/19/94 127,240 4,500
WTC 22 4% 24 05/19/94 132,800 4,700
WTC 23 4% 28 05/23/94
WTC 24 4% 28 05/23/94
WTC 25 4~ Hold
T~ Mc~ t:til~ Fn~ ~amar Cylinders Made By: V. M.
A~M C-3hC-39.c-143 ..U~ N~ Ok~.~)
Remarks anti,or Distribu6on:
cc: Gary Sieb - City of Coppell
Larry Davis - City of Coppell
Mike Sherpinskas - Diversified Construction Services~Inc.
Jim Bullock - F & S Partners // ,
Russell Willies - Brockette Davis Drake, Inc.
G~ ~nsultuts, Inc. Reviewed by:.
Al] Elam ~ ~m am f~ ~ cxclmi~ ~ of ~ clkm to w~ ~y an ~ ~ s~ ~ ~ ,~ wi~ ~ MI a~al of GEE C~, ~. ~ ~ of ~ ~ ~t ~i~