Loading...
Villas of SW-CS131107 Rhonda Adloo From:Rhonda Adloo Sent:Thursday, November 07, 2013 2:34 PM To:'rrjuvvadi@gmail.com' Cc:Michael Garza Subject:Pre-construction conference notification attached Attachments:Villas of SW-CS131107.pdf Page 2 of the attached letter lists the entities you should invite to the meeting on your behalf. Please bring the permit form from MABAK Construction that I gave you today to the meeting. A check for the amount of the inspection fees (as noted on page 3 of the permit form) will be due at the pre-construction meeting, either from your company or from Mabak. A fee for the paving inspection is also due at that time, provided you have chosen the company that will do the work by then. Let me know if you have any other questions. Rhonda Adloo Administrative Technician City of Coppell Engineering Dept. 972-304-3682 radloo@coppelltx.gov http://www.surveymonkey.com/s/RVXVDH6 “Building Community Through Public Service” 1 T H E • C I T Y • O F COPPELL * X A 8 1 November 7, 2013 Ramana Juvvadi RE: Villas of Southwestern Addition Dear Mr. Juvvadi: A pre-construction conference on the referenced project has been scheduled for Tuesday, November 12, 2013 at 9:00 a.m. in the Engineering Main conference room at 265 Parkway Blvd. Please notify the franchised utility companies, contractors, sub-contractors, testing lab and any other interested parties so that they may have a representative present. If you have any questions concerning this project prior to the scheduled meeting, feel free to contact me at(972) 304-3684. Sincerely, le,/tif.jj‘ivr),J77,_„2/44er., Larry Davis, Construction Inspector Office Phone: 972-304-3684 Fax: 972-304-3570 cc: Michael Garza, P.E., Assistant Director of Engineering Michael Arellano, Chief Building Official Jack Foster, Commercial Building Inspector Tim Oates, Deputy Chief/Prevention Public Works: Streets &Utilities 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 2 RESPONSIBILITY FOR PRE-CONSTRUCTION MEETING NOTIFICATION The owner/owner's representative will be notified of the date, time and place of the pre-construction meeting once it is scheduled by the Construction Inspector assigned to the project. It is the owner/owner representative's responsibility to notify the following parties: • Franchise Utilities (including but not limited to electric, gas, cable, & telephone providers) • Geotechnical firm • Project Engineer • Contractors or subcontractors for excavation, utility, & paving operations • SWPPP representative