CF-Cozby Library-LR 940419PIER INSPECTION REPORT
Report Date: April 19, 1994 Sample Date: April 18, 1994
Client: City of Coppell
Project: W.T. Cozby Public Library
Identification: Straight Shaft Piers
Method of Test: Visual Inspection
Depth
to
Pier Shaft Bearing Req'd Actual Total Bearing Casing
# Size Strata Pent. Pent. Depth Material Depth Remarks
A.4-2.1 18" 21' 0" 6' 0" 6' 7" 27' 7" Gray Shale 19' 8" I inch of water at the
bottom of pier hole
A.5-2.6 18" 17' 1" 6' 0" 6' 1" 23' 2" Gray Shale 16' 10"
A.4-3.0 18" 15' 9" 6' 0" 6' 5" 22' 2" Gray Shale 16' 2"
cc: Gary Sieb - City of Coppell
Mike Sherpinskas - Diversified Construction Services, Inc.
Jim Bullock - F & S Partners
Russell Williams - Brockette Davis Drake, Inc.
Our letters and reports are for the exclusive uae of the client to whom they are addressed. The uae of our name must receive our prior written approx-al. Our letters and reports apply only to
the ~amp]e te~ted and:or [n,qpected. and are not necessarily indicatlve of the quantities of apparently identical or similar produc~.