Loading...
Gateway BP(2.5)-CS131111 T H E C I T Y O F COPPELL A 8 1 $ November 11, 2013 Jeremy Routsong CalHar Construction,Inc. 2138 Ca1Har Drive Melissa TX 75454 RE: Gateway Business Park,Phase 2,Lot 1 Block B (Naterra) Overtime Inspection Dear Mr. Routsong: In accordance with your request, the City of Coppell Engineering Department provided inspection service at the referenced location on Saturday, November 9, 2013. The overtime rate including salary and benefits is $54.00 per hour. Eight hours (8 hrs.) were charged to your company on that date. Please send a copy of this letter along with your check for $432.00, payable to the City of Coppell to the following address: City of Coppell Finance Dept. 255 Parkway Blvd P.O. Box 9478 Coppell, TX 75019 If you should have any questions,please call(972) 304-3679. Sincerely, L. IV D.vis Con • ction Ins sector Office Phone: (972)304-3684 Fax: (972) 304-3570 cc: Finance Dept. Project Fee File 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 [CaiHar Construction, Inc. November 6,2013 City of Coppell Engineering Dept. Attn: Larry Davis 255 Parkway Blvd. Coppell, TX 75019-4409 Office:972-304-3684 Fax: 972-304-3570 RE: Naterra Corp / Ca1Har Job#212404 1250 S Freeport Parkway Coppell,Texas Mr. Davis: We are requesting Saturday inspection for November 9,2013. Our Foreman on-site will be Dennis Daniels. His mobile phone number is 214-325-1876. Please forward invoices for over-time inspection fees to our office as needed. Any questions or comments,please contact me at 972-816-8964. Sincerely, Jeremy Routsong Project Manager 2138 CalHar Drive* Melissa,Texas 75454 * Office 972-838-2888 *Fax 972-838-2299 TO d elVH1d0 66ZZ8E8ZL6 bZ:ET ETOZ/LO/TT