DR1201-CR131105 T H E • C 1 T Y • O F
COPPELL
e q
x A s DAILY CONSTRUCTION REPORT
PROJECT: CREEKVIEW DR RETAINING r
WALL&ROADWAY DATE /I 17 1?Cr j>REPORT#
IMPROVEMENTS
DAY IM 1 e I W T f F IS I S
PROJECT NO. DR 12-01
WEATHER SUN CLEAR OVERCAST .0 SNOW
OWNER: CITY of COPPELL TEMP To 32 32-50 •-70 70-85 85 up
CONTRACTOR: FAIN GROUP WIND Still CO Hi_h Overtime Form
HUMIDITY Dry Mod ,� Submitted? Y /N
PROJECT INSP: LARRY DAVIS
AVERAGE FIELD FORCE
NAME OF NON-MANUAL MANUAL REMARKS
CONTRACTOR/SUBCONTRACTOR
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
Rai; — rao
Wee 7i)1 j ld.'." 44,1114 ��►�
f y 1
/IP/
SIGNATURE
ENGINEERING INSPECTOR