Loading...
DR1201-CR131106 dómiL F x 9 A S. t DAILY CONSTRUCTION REPORT PROJECT: CREEKVIEW DR RETAINING (/( ZVj 3 WALL&ROADWAY DATE if j y { REPORT# IMPROVEMENTS DAY M T 169 T IF S IS PROJECT NO. DR 12-01 WEATHER SUN LEAR OVERCAST RAIN SNOW OWNER: CITY of COPPELL TEMP To 32 32-50 CO> 70-85 85 up WIND Still High Overtime Form CONTRACTOR: FAIN GROUP HUMIDITY Dry 410 Humid Submitted? Y /N PROJECT INSP: LARRY DAVIS AVERAGE FIELD FORCE NAME OF NON-MANUAL MANUAL REMARKS CONTRACTOR/SUBCONTRACTOR VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: fr�a w — C a rl hoe ots ' p/ukr & 3 f vee 'S me g p.rv . G.''e. v!`PI pp, 4.4err9 of )4 to ef%57: L 7 e 1 /. SIGNATURE ENGINEERING INSPECTOR