DR1201-CR131106 dómiL
F x
9
A S. t DAILY CONSTRUCTION REPORT
PROJECT: CREEKVIEW DR RETAINING (/( ZVj 3
WALL&ROADWAY DATE if j y { REPORT#
IMPROVEMENTS
DAY M T 169 T IF S IS
PROJECT NO. DR 12-01
WEATHER SUN LEAR OVERCAST RAIN SNOW
OWNER: CITY of COPPELL TEMP To 32 32-50 CO> 70-85 85 up
WIND Still High Overtime Form
CONTRACTOR: FAIN GROUP HUMIDITY Dry 410 Humid Submitted? Y /N
PROJECT INSP: LARRY DAVIS
AVERAGE FIELD FORCE
NAME OF NON-MANUAL MANUAL REMARKS
CONTRACTOR/SUBCONTRACTOR
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
fr�a w —
C a rl hoe ots ' p/ukr & 3 f vee 'S
me g p.rv . G.''e. v!`PI pp, 4.4err9
of )4 to ef%57: L 7 e
1
/.
SIGNATURE
ENGINEERING INSPECTOR