DR1201-CR131107 T H E • C 1 T Y • O F
COPPELL
T ^ o
5 ' a DAILY CONSTRUCTION REPORT
PROJECT: CREEKVIEW DR RETAINING t
WALL&ROADWAY DATE �` .1( 200 REPORT#
IMPROVEMENTS `
DAY ) M IT 1117 101F Is Is 1
PROJECT NO. DR 12-01
WEATHER SUN ...r OVERCAST RAIN SNOW
OWNER: CITY of COPPELL TEMP To 32 32-50 r50-774 70-85 85 up
WIND till Mod High Overtime Form
CONTRACTOR: FAIN GROUP HUMIDITY Mod Humid Submitted? Y /N
PROJECT INSP: LARRY DAVIS
AVERAGE FIELD FORCE
NAME OF NON-MANUAL MANUAL REMARKS
CONTRACTOR/SUBCONTRACTOR
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
NO
/t./.11/ SIGNATURE
ENGINEERING INSPECTOR