Loading...
DR1201-CR131107 T H E • C 1 T Y • O F COPPELL T ^ o 5 ' a DAILY CONSTRUCTION REPORT PROJECT: CREEKVIEW DR RETAINING t WALL&ROADWAY DATE �` .1( 200 REPORT# IMPROVEMENTS ` DAY ) M IT 1117 101F Is Is 1 PROJECT NO. DR 12-01 WEATHER SUN ...r OVERCAST RAIN SNOW OWNER: CITY of COPPELL TEMP To 32 32-50 r50-774 70-85 85 up WIND till Mod High Overtime Form CONTRACTOR: FAIN GROUP HUMIDITY Mod Humid Submitted? Y /N PROJECT INSP: LARRY DAVIS AVERAGE FIELD FORCE NAME OF NON-MANUAL MANUAL REMARKS CONTRACTOR/SUBCONTRACTOR VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: NO /t./.11/ SIGNATURE ENGINEERING INSPECTOR