Loading...
WA9302A-CS 970919 21~-561-020~ ~"~NKLE PAGE 01/81 09/19/1997 ll:8G 21~-36~a'828~ SHIMEK,JACOBE SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dail~, Texas 75225-5816 Fax (214) 361-0204 Phone (2 14) 361-7900 MEMORANDUM To: G.E. Team Controls, Inc. North Texas Muncipal Construction Co., Inc. Ma Cast, City of Coppel L,~Davis, City of Copp From: Gary C. Henriticks, P.E. Date: September 19, 1997 City of Coppell Subject: Village Parkway Pump Station SCADA System Walk-through A walk-through of the Village Parkway Pump Station, SCADA System was conducted on September 11, 1997. In attendance were: Matt Cast, City of Coppell Larry Davis, City of Coppell Steve Baker, G.E. Team Controls Gary blendricks, Shimek, Jacobs & Finklea, L.L.P. The following items were found to be in need of additional work or correction: 1. Additional training for the supervisory level staff is still incomplete 2. The text on the ground storage and elevated storage tanks becomes illegible as the water surface drops (text and background are same color) 3. We still have not seen the report spreadsheets (neither format, printout nor on screen) 4. Steve Baker indicated he would get Coppell a revised schedule of values for the SCADA System which includes the new computer and associated software ( He has delivered this as of the publishing of this memo). 5. The pump set points screen does not appear to properly interrupt the pump sequence as expected. We were not able to ei'ther turn on or off a pump that was not currently in the rotation 6- We are continuing to have problems with the IMPACC software and the data received from the IQ's. As of the publishing date of this memo, G.E. Team Controls has requested tlmt they be allowed to approach this problem from a new angle. This request is documented in a letter from Team dated September 17, 1997. A formal response is expected from Coppeli next week; however, we have discussed this with both Ken Griffin and Man Cast and offer no objections. As a reminder, the yet to be forrealized agreement with NTMCC provided that all aspects of the project be completed to the City's satisfaction by September 30, 1997.