Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
CF-Cozby Library-LR 940427
PIER INSPECTION REPORT Report Date: April 26, 1994 Inspection Date: April 25, 1994 Client: City of Coppell REVISED APRIL 27, 1994 Project: W.T. Cozby Public Library Identification: Straight Shaft Piers Method of Test: Visual Inspection Depth to Bearing Pier Shaft Strata Req'd Actual Total Bearing Casing # Size (Pene.) Pent. Pent. Depth Material Depth Remarks J-I 1 18" 17' 4" 6' O" 8' 9" 26' 1" Gray Shale 16' 6" 3.5" of water, Plumb, Clean J-10 18" 16' 8" 6' 0" 7' 6" 24' 2" Gray Shale 16' 8" Clean, Plumb, Dry J-9 18" 17' 9" 6' O" 6' 4" 24' 1" Gray Shale 18' 0" Clean, Plumb, Dr)' J-8 18" 18' 3" 6' 0" 6' 6" 24' 9" Gray Shale 17' 8" Clean, Plumb, Dry J-7.5 18" 18' 8" 6' 0" 6' 0" 24' 8" Gray Shale 21' 11" Clean, Plumb, DD' G-13 24" 18' 6" 6' 0" 6' 1" 24' 7" Gray Shale 16' 10" Clean, Plumb, Dry G-II.8 24" 17' 3" 10' 0" 10' 0" 27' 3" Gray Shale 16' 11" Clean, Plumb, Dry D-12 18" 17' 5" 6' 0" 7' 3" 24' 8" Gray Shale 16' 10" Clean, Plumb, Dr), J-6.5 18" 18' 9" 6' O" 6' 1" 24' 10" Gray Shale 19' 3" Clean, Plumb, Dr)' J-5 18" 17' 11" 6' 0" 6' 4" 24' 3" Gray Shale 17' 8" Clean, Plumb, Dr)' J4 18" 18' 4" 6' 0" 6' 2" 24' 6" Gray Shale 16' 11" 6" of water, Plumb, Clean J-6 18" 19' 0" 6' 0" 6' 4" 25' 4" Gray Shale 17' 4" Clean, Plumb, Dry J-3 18' 19' 4" 6' O" 6' Il" 26' 3' Gray Shale 17' 10" Clean, Plumb, Dry cc: Gary Sieb - City of Coppell Mike Sherpinskas - Diversified Construction Jim Bullock - F & S Partners Russell Williams - Brockette Davis Drake Out letters and reports are for the cxclusi,~e use of tl~ client to v. hom they are addressed. The me of our name must recel,x~ our prior written appro,,-al. Our letters a.nd ~vpot,~ apply on]~, to the sample tested and:or iml~'ted, and are not ~cessarily indicative of th~ quantifie~ of apparently kieran, cai or similar products.