Loading...
PA9901-CS091110 Rhonda Adloo From:John Elias Sent:Tuesday, November 10, 2009 9:12 AM To:Keith Marvin Subject:Fwd: Wagon Wheel Well Attachments:20091109170828.pdf; 20091109171409.pdf; 20091109171544.pdf Keith, We are getting close to bidding out the 2nd irrigation well at wagon wheel park. I need some in-put from you or public works regarding the second question of this email, dealing with capping the water line. John >>> "Chad Pendley" <chad@rlkengineering.com> 11/9/2009 5:15 PM >>> John, I am starting to put all the final documents together and should have them available by Wednesday for your review. I received a quote from MPS for a radio transmission setup on controllers. I would assume that Coppell would rather MPS do the work on that since they manage the current system. In that case it is probably best just to show that work as "by others" in the plans and specifications. If not, then I can basically specify this type of system and let the general contractor bid on it. (See attached quote). Second, you are currently supplementing the wet well with a city water supply line. If I remember correctly, this well is to take over for that supply. If so, the best thing to do here is disconnect the city supply line and cap it off. We then could connect the proposed irrigation line to the old city supply line as it goes into the wet well. This will make things much simpler and cheaper on the connection. The question is whether you want us to cap the city supply line off back at the last fire hydrant, or cap it at the pump house and add another FH, or blow off valve. (See Attachments). Chad A. Pendley, P.E. Project Manager RLK Engineering, Inc. 6175 Main Street, Suite 395 Frisco, Texas 75034 (214) 619-1733 1