Loading...
CF-Cozby Library-LR 940428PIER INSPECTION REPORT Report Date: April 28, 1994 Inspection Date: April 27, 1994 Client: City of Coppell Project: W.T. Cozby Public Library Identification: Straight Shaft Piers Method of Test: Visual Inspection Depth to Bearing Pier Shaft Strata Req'd Actual Total Bearing Casing # Size (Pene.) Pent. Pent. Depth Material Depth Remarks B-II 24" 18' 4" 5' 0" 6' 1" 24' 5" Gray Shale 17' 8" Clean, Plumb, Dry B-10 24' 18' 0" 5' 0" 5' 2" 23' 2" Gray Shale 15' 6" Clean, Plumb, Dry B-9 24" 18' 0" 5' 0' 5' 2" 23' 2' Gray Shale 16' 2' Clean, Plumb, Dry B-8 24" 18' 1' 5' O' 5' 1" 23' 2" Gray Shale 15' 9' Clean, Plumb, Dr3' B-7 24" 18' 7" 5' 0' 5' 8' 24' 3" Gray Shale 15' 7" Clean, Plumb, Dry. B-6 24' 18' 3' 5' 0' 5' 1" 23' 4" Gray Shale 15' 6" Clean, Plumb, Dry B-5 24' 16' 6' 5' O" 5' 6" 22' 0' Gray Shale 15' 8" Clean, Plumb, Dry B-4 24" 15' 10" 5' 0" 5' 0' 20' 10' Gray Shale 15' 5" Clean, Plumb, Dry B-3 24" 16' 4" 5' 0" 5' 4" 21' 8" Gray Shale 16' 9' Clean, Plumb, Dry B-2.6 18" 16' 0" 6' 0" 6' il' 22' 11" Gray Shale 15' 2' Clean, Plumb, Dry B-2 18" 15' 9" 6' 0" 6' 2" 21' 11" Gray Shale 15' 10" Clean, 1" of water, Plumb A.7-13 18' 16' 0' 6' 0' 6' 8" 22' 8" Gray Shale 16' 2" Clean, Plumb, Dry B.2-1 18' 17' 3" 6' 0" 8' 10" 26' 1" Gray Shale 16' 0" Clean, 4.5" of water, Plumb cc: Gary Sieb - City of Coppell Mike Sherpinskas - Diversified Construction Jim Bullock - F & S Partners Russell Williams - Brockette Davis Drake Out letters and r~por~s am for the oxclmb.'e use of th~ client to whom they am afldreased. Tl~ u~e of our narn~ must recei,~ our prior ~.'ritlen apprc~-al. OUr letters and ~ports apply only to the sampt-, teasted andtor inspected, and a~: not necessarily indicativ~ of th~ quantilies of apparently identical or similar pr~.