Loading...
Gateway Corp Ctr-CS100126 Rhonda Adloo From:Keith Marvin Sent:Tuesday, January 26, 2010 11:37 AM To:Marcie Diamond Subject:Re: Fwd: More help needed on Gateway Business Park I called him and told him Andrew has my response, and that if they need more info, they can call me back. Keith >>> Marcie Diamond 1/26/2010 11:22 AM >>> thanks! would you or did you call Mr. Nelson? >>> On 1/26/2010 at 11:17 AM, in message <4B5ECE77.4038.00D9.0@ci.coppell.tx.us>, Keith Marvin wrote: Andrew, Marcie Diamond asked me to respond to your questions relative to Right of Way in the areas described in your email below. The following comes from our Major Thoroughfare Plan: Freeport Parkway from IH 635 to Sandy Lake is designated as a C4D/6 which would typically require a 110' ROW Dividend Drive from Freeport to Belt Line Road is designated as a C4U which would typically require a 70' ROW Wrangler Drive from Freeport to Belt Line Road is designated as a C4U which would typically require a 70' ROW Fritz Drive from Gateway Blvd. to Freeport Pkwy. is designated as a C2U which would typically require a 60' ROW According to what you have provided below there is less than the typical ROW for Freeport Pkwy, Wrangler Drive, and Fritz Drive. We would likely ask for additional ROW dedication along Fritz Drive. Along Wrangler and Freeport it appears that Utility & pedestrian access easements have been dedicated. This often is used to substitute for deficient ROW. There are no current plans to expand any of these thoroughfares. Please feel free to contact me if I can provide any additional information. Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> Marcie Diamond 1/25/2010 3:04 PM >>> Keith, Could/would you assist with this? thanks Marcie 1 >>> On 1/22/2010 at 5:11 PM, in message <FA372AD1A4C2FF478D2C2913A042CFE45234DE3E@srvR11.HALFF.AD>, "Shafer, Andy" <ashafer@halff.com> wrote: Hello again Marcie, I need a little more help if I could on the properties in Gateway Business Park that I previously requested zoning verification from you on. I now have been asked to confirm with the City whether or not there are any PROPOSED CHANGES IN THE STREET RIGHT-OF-WAYS for the streets abutting our project. Specifically this would include the following: FREEPORT PARKWAY: FROM IH635 TO FRITZ DRIVE. (Currently we show as 100' wide right-of-way up to Airline and 80' wide from there, plus various turn lanes) DIVIDEND DRIVE: FROM FREEPORT PARKWAY EAST APPROX 1300 FEET. (Currently we show as 75' wide right-of-way) WRANGLER DRIVE: FROM FREEPORT PARKWAY EAST APPROX 800 FEET. (Currently we show as 65' wide right-of-way) FRITZ DIRVE: FROM FREEPORT PARKWAY WEST APPROX. 800 FEET. (Currently we show as 57.5' wide right-of-way). I guess the two questions would be (1) Does the City of Coppell's master thoroughfare plan show ultimate right-of-way widths wider than existing right-of-ways for these streets, and (2) If any of these properties were to be platted (if not already platted), or re-platted would the city require any additional right-of-way dedications. I don't know if this is your departments area, or if it is engineering. If not your department I'd need to know where to forward this question to. As always, we appreciate your help! Andrew J Shafer, RPLS Survey Department Manager HALFF ASSOCIATES, INC. 1201 North Bowser Road Richardson, Texas 75081 Phone 214-346-6208 Fax214-739-0095 www.halff.com 2