Loading...
CF-Cozby Library-LR 940520 (07) REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIl, Method: ASTM D2922 D3017 D698 Page 1 of 2 Client: City of Coppell Material Description Maximum Optimum Dr..' Moisture Density Content Project: W.T. Cozby Library ~/cu~t) Percent Test Date: April 7, 1994 1. Select Fill: Reddish Bro~ Clayey Sand 112.5 13.2 Report Date: May 20, 1994 2. Required Density (%): 95% to 105% 3. Required Moisture (%): :t:3% Optimum 4. Mat LocatiordEIcvation (an&'oO Lift In-Place In-Place Percent No. Dry Density Moisture Compaction Test No. (Lbs/C'uFO Content (~) Probe Depth 1 Building Pad Select Fill - 1st Lift 25 113.3 14.8 100.7 6" 24' east and 45' south of northwest corner 1 Building Pad Select Fill - 1s' Lift 26 109.2 13.1 97.1 6" 8' south and 9' east of northwest corner 1 Building Pad Select Fill - 1'~' Lift 27 112.5 12.0 100.0 BS 45' west and 50' north of southeast corner 1 Building Pad Select Fill - 1st Lift 28 115.6 14.2 102.8 BS 30' west and 24' north of southeast corner 1 Building Pad Select Fill - 1st Lift 29 118.0 12.5 104.9 BS 15' south and 12' west of northeast corner Above Test Results Meet Specification Requirements GEE Consultants, Inc. (214) 620-9791 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Method: ASTM D2922 D3017 D698 Page 2 of 2 Client: City of Coppell b~aterial Descrilotion Maximum Optimum DH Moisture Density Conte~t Project: W.T. Cozby Library (Lbs!CuFt) Percent Test Date: April 7, 1994 1. Select Fill: Reddish Brown Clayey Sand 112.5 13.2 Report Date: May 20, 1994 2. Required Density (%): 95% to 105% 3. Required Moisture (%): +3% Optimum 4. Mat Location/Elevatio~ (and'or) Lift In-Place In-Place Percent No. DO' DensiB,' Moisture Compaction Test No. (Lbs/CuFf) Content (ft.) Probe Depth 1 Building Pad Select Fill - 1st Lift 30 113.3 13.0 100.7 BS 12' south and 60' west of northeast corner I Building Pad Select Fill - 1st Lift 31 117.8 10.7 104.4 BS 30' north and 90' west of southeast corner 1 Building Pad Select Fill - 1st Lift 32 110.5 12.2 98.2 BS 60' north and 125' west of southeast corner 1 Building Pad Select Fill o 1st Lift 33 111.8 13.0 99.4 BS 30' south and 125' west of northeast corner 1 Building Pad Select Fill - 1't Lift 34 113.4 14.3 100.8 BS 30' north and 75' east of southwest corner 1 Building Pad Select Fill - 1st Lift 35 117.5 14.5 104.4 BS 30' east and 18' north of southwest corner Above Test Results Meet Specification Requirements cc: Gary Sieb - City of Coppell Mike Sherpinskas - Diversified Construction Sen, ices, Inc. Jim Bullock - F & S Partners Robert Williams - Brockette Davis Drake, Inc. inspected, and are no~ re~casarily indicatlvc o£ti~ quantitlos of apparently identical or sln~lar products.