Loading...
ST9902-LR131113AwAnce �j �eorecHnic�� GROUP Acct ID: 1770 Report Date: 11/13/2013 Project: West Sandy Lake Road Location: Rebar Inspection Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 File No: C13 -0634 Date Sampled: 11/01/2013 Sampled By: By Order Of: Order Number: 1770 Client: City of Coppell REPORT: Daily Field Activity LAB NO: 154537 TEST RESULTS Report No: 154537 Page 1 of 1 As requested, a representative of Alliance Geotechnical Group, went to the project site for rebar inspection. Drawings Utilized: Teague Nall and Perkins Prints Sheet 83, Sheet IGTS Locations /Item Inspected: As shown on Sheet 83 Discrepancies /Comments: A visual inspection was performed on bridge slab layout phase 1. 1.) 60 grade epoxy coated rebar used. Coated wire used for tie wire. 2.) Spacing of rebar for T bars comply after minor repairs made. 3.) Spacing of #5 rebar (A Bars) comply after minor repairs made. 4.) U bars at rail comply for size and spacing. 5.) Placement at ends (3') comply per sheet IGTS. 6.) Placement and spacing over bents comply. 7.) Clear cover of at least 2" maintained. Client: City of Coppell Attn: Mr. Rick O'Dell (1 -cc copy) Orig: City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. Respectfully Submitted, Alliance Geotechnical Group Perry C. Kakara, CME Department Manager THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.