DR1201-CS131114 T H E C 1 T Y O F
COPPELL
9
A 8 1
November 14, 2013
Ernest L. Fields, P.E.
Walter P. Moore
1845 Woodall Rogers Frwy, Suite 1650
Dallas TX 75201
RE: Creekview Dr. Retaining Wall & Roadway Improvements
Project DR 12-01
Dear Mr. Fields:
I am sending under cover of this letter two sets of testing results on the above captioned project.
The enclosed information, titled "Tie-back Test Log" was provided to me by Mark from ARC,
subcontractors to Fain Group.
Please review and comment on these test results at your earliest convenience. You may send
your comments to my attention, with a copy to Rod Lacy, Fain Group and George Marshall, P.E.
Thanks in advance for your attention to this request.
Sincerely,
I •
Larry D•vis
Construction Inspector
Phone: 972-304-3684
Fax: 972-304-3570
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673