Loading...
Carrollton Dam-CS130322 Rhonda Adloo From:Brashear, Kimberlie <kimberlie.brashear@dallascityhall.com> Sent:Friday, March 22, 2013 1:45 PM To:Keith Marvin; Bobby Brady Subject:Carrollton Dam Construction and drainage system plans Attachments:drainage at dam.ppt Keith and Bobby, We are just about complete with construction. Complete demobilization will depend on some factors at the other dams with respect to moving the staging area and stored materials. The fencing is still pending. I am wondering if it would be possible to get copies of the drainage system plans that feed into the river there from the McInnish Park at two points on the left bank and from Coppell on the right bank (possibly golf course but maybe residential)? Thank you, Kimberlie Kimberlie West Brashear, P.E. - Project Manager Water Facilities Project Management Dallas Water Utilities 2121 Main Street, Suite 300 Dallas, TX 75201 214-948-4249 214-717-7709 (cell) fax 214-243-1118 1