Carrollton Dam-CS130322
Rhonda Adloo
From:Brashear, Kimberlie <kimberlie.brashear@dallascityhall.com>
Sent:Friday, March 22, 2013 1:45 PM
To:Keith Marvin; Bobby Brady
Subject:Carrollton Dam Construction and drainage system plans
Attachments:drainage at dam.ppt
Keith and Bobby,
We are just about complete with construction. Complete demobilization will depend on some factors at the other dams
with respect to moving the staging area and stored materials. The fencing is still pending.
I am wondering if it would be possible to get copies of the drainage system plans that feed into the river there from the
McInnish Park at two points on the left bank and from Coppell on the right bank (possibly golf course but maybe
residential)?
Thank you,
Kimberlie
Kimberlie West Brashear, P.E. - Project Manager
Water Facilities Project Management
Dallas Water Utilities
2121 Main Street, Suite 300
Dallas, TX 75201
214-948-4249
214-717-7709 (cell)
fax 214-243-1118