Loading...
ST0501-CL130210 Rhonda Adloo From:bobby@calcontex.com Sent:Sunday, February 10, 2013 9:27 AM To:Keith Marvin; Michael Garza Cc:Alberto Samaniego Subject:Deforest Rd Gentlemen, I am emailing you both in hope that you might be of some assistance. George Marshall and Larry have supposedly charged Tiseo Paving $38,000.00 for liquidated damages on the Deforest Rd project. I am not sure if anyone is aware of this, but Tiseo has charged the entire $38,000.00 to us thus putting us in financial strain as this was over 10% of our contract. I understand the purpose of liquidated damages and respect the role they play in protecting the owner against non-responsive general contractors. I can not speak for Tiseo, but I know we were there working with at least a small crew everyday possible. We completed our work and made every correction or addition asked by George or Larry. We were responsive to the home owners along Deforest Rd and the adjacent sub-division and felt like, as usual, our work and relationship with our clients was good if not excellent. As I stated earlier, I cannot speak to the relationship the City had with Tiseo. I do know, that it has been a long one. We do have a relationship with both of you gentlemen, so I am reaching out in hopes that there still might be an opportunity to resolve this matter in a way that reflects the entire scope of the project and not just the 38 days it has been determined to be late. Finally, I would hope someone would consider the price at which we bid our scopes of work. I missed the price of the retaining wall and would bet we were low on those two scopes by over $40,000 combined. Tiseo is my largest client, so I am not wanting to rock the boat with them. My attempts to negotiate with them have not been fruitful to say the least. Any help you might be would be greatly appreciated. Thank you for taking time to read this email. Bobby Bounds California Construction 44 Tranquil Pond Drive Frisco, Texas 75034 972-670-0368 cell 1