Loading...
CF-Cozby Library-LR 940424REPORT OF CONCRETE MIX INSPECTION Report Date: April 24, 1994 Date Concrete Placed: April 18, 1994 Standard 6"xl2" Client: City of Coppell Area 28.27 Square Inches Project: W.T. Cozby Public Library Contractor: Diversified Construction Services, Inc. Concrete Supplier and Plant: Texas Industries, Inc. - Plant #41 Location of Placement: Drilled Piers MATERIALS s,~.~, sso n,,~w,,. INSPECTION DATA De. set, ion (Lhs~CuYd) Mix Number: 8203 Time Sample Batched: 10:55 am Cement: Time Sampled: 12:05 pm Fl)' Ash: Sample Location: A.4-5 TmckfTicket No: 86.'209114 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 88°F Fine Aggregate: Concrete Range: 84°F Admixtures: Slump Range (inches): 5M Weather Conditions: Partly Cloudy i Time Started: N/A 2 Time Completed: N!A Added Water: Sample Air Content (5~): No Test Total Cubic Yards Placed: 7.0 Required Strength (Lbs.lsq.in.): 3,000 Specimen Measured A~ Da~ Tolal ~ Compr~ssbn: Strength Remarl~ N ~aber Slump (in. (Da)~) Tested (Lbs.) ILbs./Sq.ln.) WTC 6 5% 7 04/26/94 95,600 3,380 WTC 7 5% 7 04/26/94 105,440 3,730 WTC 8 5% 28 05/17/94 WTC 9 5% 28 05/17/94 WTC 10 5% Hold Test Methods Utilizc~l Fracture Regular Cylinders Made By: V.M. ASTM C-31 .C-39,C-143 ,.'L'rdess Noexl Otbcm.-isc) Remarks and/or Distribution: cc: Gary Sieb - City of Coppell Mike Sherpinskas - Diversified Construction Services, Inc. Jim Bullock - F & S Partners Russell Williams - Brockette Davis Drake, Inc. Gi~'~ ~Ollstll~:~'l:~=, Ill~o Reviewed by: All letters and repor~ am for tl~ ¢xclmix~o we of tl~ client to v. hom ti~y are addressed and shall not ~e reprodueed withoul th~ full appear'al of' GEE Cor~ultan~, Inc. Tho use of our name mtt~t receive our prior v,.rltten approval. Our letters and reports apply only to the sample Lc. sled and/of impectcd and a~ not .necessarily indicatix'e of th~ quantities of apparently identical or similar ptoduct$.