Villas of SW-CS131114 (2)
Rhonda Adloo
From:Michael Garza
Sent:Thursday, November 14, 2013 10:35 AM
To:vborra@gmail.com
Cc:Rhonda Adloo
Subject:inspection fees
Vijay,
You or the contractor will need to pay the inspection fees for this project, it was my understanding that you were
bringing a check to the pre-con. I will need the permit submitted to me to sign, along with the inspection fees
check. These will need to be submitted ASAP or we will need to stop the project until they are submitted.
Thanks,
Michael Garza, P.E.
Assistant Director of Engineering
City of Coppell
972-304-7019
1