Loading...
CF-Cozby Library-LR 940424 (2)REPORT OF CONCRETE MIX INSPECTION Report Date: April 24, 1994 Date Concrete Placed: April 18, 1994 Standard 6"x12" Client: City of Coppell Area 28.27 Square Inches Project: W.T. Cozby Public Library Contractor: Diversified Construction Services, Inc. Concrete Supplier and Plant: Texas Industries, Inc. - Plant #41 Location of Placement: Drilled Piers MATERIALS s~,~, ss~ ~,,d,w,,. INSPECTION DATA De~.nipiion (Lb~tCuYd) Mix Number: 8271 Time Sample Batched: 2:47 pm Cement: Time Sampled: 4:00 pm Fly Ash: Sample Location: A.4-3 ' Truck/Ticket No: 96/208663 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 84°F Fine Aggregate: Concrete Range: 84°F Admixtures: Slump Range (inches): 4.5 Weather Conditions: Clear I Time Started: 3:15 pm 2 Time Completed: 4:45 pm Added Water: Sample Air Content (%): No test Total Cubic Yards Placed: 7.0 Required Strength (Lbs./sq.in.): 3,000 Sw-xirn~'n Measured Age Date Total Load Compressive Strength Remarks Number Slump Ih.) fDays) Teated fl-.ba. ) (Lb~.'$q.ln.) WTC 1 4½ 7 04/25/94 63,420 2,240 WTC 2 4½ 7 04/25/94 73,220 2,590 WTC 3 4½ 28 05/16/94 WTC 4 4% 28 05/16/94 WTC 5 4½ Hold Test Methods Utilized Fracture Regular Cylinders Made By: V. M. ASTM C-31,C-39.C-143 (Unle.~ Notnd Otherwisel Remarks and;or Distribution: cc: Gary Sieb - City of Coppell Mike Sherpinskas - Diversified Construction Services, Inc. Jim Bullock - F & S Partners Russell Williams - Brockette Davis Drake, Inc. GEE ~onsultant:s, Xnc. Reviewed by: All let~:rs and repor~ are for th~ exclusive use of the client to whom the)' are addressed and shall not lx~ t~produc~d withota th~ full approval of GEE Consultants, Inc. '1'I~ tt~e of our name m~.st receix~ our prior written approval. Our lettem and reports apply only to th~ sample tested snd.'or L~pe, cnnd and are not n~ssaril.v indicative of the quantities of apparently identical or similar produots.