CONSTRUCTION DEVELOPMENT PERMIT APPLICATION
Name of Applicant MAn shier appall 2, LT/) Date Submitted ////1/ /3
Address of Applicant 415-4 "/. O 'c ci o.2 go. 2$444, n 7504 2.—
Phone Number 469- 1/i 7 • p/o 0 Fax Number 96/. 0/04-
Location of Construction (address, if available): EA-51" Stor. OP S. CaPPEUL
Subdivision 1/etl,tmti OF 61.4 Section# Block# Lot#
GoPPEei.
OR Survey/Abstract# n,,,gES A .S,y,to,,S/Ziy Acreage 8.(-31
Location description (attach vicinity map): Arr, rA 4
1. Type of proposed construction or development:
Residential C Alteration of a natural waterway drainage course
C Non-Residential C Other(describe& attach drawing or sketch)
C Placement of Fill (in right-of-way or on private property)
2. Description of Construction Permit requested:
[v(Paving ❑ Median or Landscape ❑ Box Culvert
❑ Sidewalk ❑ Water Main ❑ Rip Rap
❑ Drive Approach ❑ R.C.P. ❑ Fill Area
❑ Excavation ❑ Sanitary Sewer Main ❑ Drainage Channel Excavation
❑ Fire Lane ❑ Flume ❑ Slope Protection/Retaining Wall
❑ Bridge ❑ Inlet ❑ Parking Lot
Provide an attachment containing the name and 24-hr. contact phone number
of supervisor(s) for every contractor working under this general permit.
3.All construction shall be in compliance with, but not limited to, the City of Coppell Subdivision
Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The
contractors shall adhere to the City's Erosion Control& Sedimentation Ordinance.
4.Applicant shall provide a copy of approved plans, specifications and the related cost estimate or
contract for the purpose of permit fee calculation verification.
CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Page 2
5.A Construction Inspection Permit Fee shall be paid prior to beginning work, in accordance with
the City of Coppell Fee Ordinance. See Page 3 for calculation formula.
Amount Due ,F Date Paid: 4'14,//1/13444,
NOTE: A separate excavation permit is required anytime pavement is cut or when there is work in the
right-of-way not approved by the City Engineer.
➢Any work requiring closure of a lane of traffic, street, or alley must be approved in
advance by the Engineering Dept., with notification to the following prior to
closure:
Police Department @ 972-304-3600 Street Department @ 972-462-5150
Fire Department @ 972-304-3512 Engineering Dept. @ 972-304-3679
➢Attach barricade plan I trench safety plan of a lane or street closure. (Required)
➢It is a requirement of this permit that As-Built Drawings be turned in at the end of
this project. As-Builts consist of 1 set full size paper copy, 1 set full size mylar and a
CD with Autocad.dwg files.
NOTE:Street closures are allowed from 9:00 a.m.until 3:30 p.m.ONLY
unless otherwise approved by City Engineer.
➢A pre-construction meeting is required prior to beginning work related to this permit.
Contact the inspector assigned to your project to schedule the meeting.
Printing your name indicates your acceptance of the terms and conditions of this form:
=#iali2Za (Sibi) qt 7. oloi
Signature of Applicant Contact Number
?rdK O 'DELL 469- S76 -77o9
Signature of Inspector Contact Number
FOR CITY USE ONLY
Is the fill area located in an identified flood hazard area? C Yes C No
If YES, a Floodplain Development Permit is required before any construction can begin.
Is additional information required? C Yes C No
Are other federal, state, or local permits required? C Yes C No
C PERMIT APPLICATION APPROVED C PERMIT APPLICATION DENIED
City Approval Date
Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand
or cause of action that may be made or come against it by reason of or if any way arising out of the closure,
blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such
permit is granted.
N t , C t T 0- 10. Page 3
COFFELL
•
INSPECTION FEE CALCULATION SHEET
Project Name I1i4-1,4 Shire-6-7- ,2 Date t 1 • 146 • 13
As per the City of Coppell Subdivision Regulations,the Developer shall pay 4%of the cost of the items to be permitted and inspected by
the Engineering Department and dedicated to the City. The Developer shall pay 2% of the items to be inspected by the Engineering
Department,but not dedicated to the City such as parking lots,private utilities,private drainage systems and so forth. Inspection fees are
due on or before the date of the Pre-construction Meeting.
In order to verify the inspection fee due, please provide a copy of the development contract(s) and this spreadsheet with
completed calculations to the Engineering Dept. The contract(s) should indicate the cost to construct the following
improvements:
PUBLIC IMPROVEMENTS U PRIVATE IMPROVEMENTS o
CONTRACT AMOUNT X 40/0= CONTRACT AMOUNT X 2°/0=
Paving # 350,511 . oS 413,222 . 95
Water
Sanitary Sewer
Storm Sewer
Alleys
Sidewalks
Other
Total •
Grand Total (total of
both colored fields) It 13 2Z.2. .`CAS
10/24/2013
RKM UTILITY SERVICES,INC.
1805 ROYAL LANE# 107
DALLAS TEXAS 75229
PH-972.241.2621 FAX-972.241.2624
BID PROPOSAL
OLD TOWN MAIN STREET PHASE II
COPPELL
ITEM DESCRIPTION QUANT. UNIT UNIT PRICE TOTAL
STREET PAVING
1 SAWCUT 2376 LF $2.50 $5,940.00
2 PAVEMENT REMOVAL 385 SY $7.00 $2,695.00
3 8"LIME STABILIZATION 7283 SY $5.80 $42,241.40
4 6"3600 PSI STREET PAVING 5405 SY $32.80 $177,284.00
5 CONSTRUCTION JOINT 200 LF $7.00 $1,400.00
6 6"3600 PSI ALLEY PAVING 1377 SY $35.45 $48,814.65
7 INTEGRAL CURB 2696 LF $1.00 $2,696.00
8 ACCESSIBLE RAMP W STAMPED CONC. 2 EA $3,100.00 $6,200.00
9 STANDARD RAMP 18 EA $1,200.00 $21,600.00
10 STANDARD SIDEWALK 453 SY $30.00 $13,590.00
11 BARRICADES TRAFFIC OCNTROL 1 LS $1,000.00 $1,000.00
12 BONDS 1 LS $3,709.50 $3,709.50
13 STAMPED COLORED CONCRETE 138 SY $75.00 $10,350.00
14 8"LIME STABILIZATION (ALLEY"D") 589 SY $5.80 $3,416.20
15 6"3600 PSI ALLEY PAVING (ALLEY"D") 572 SY $35.45 $20,277.40
16 BONDS(ALLEY"D") 1 LS $651.00 $651.00
$361,865.15
EXCULSIONS
1). Prices are good if added to base contract within 30 calendar days from the date above.
2). Engineering, survey, Lab, permits &Insp. Fee's required to be paid by owner.
3). No permanent material taxes are included.
4). If additional move-Ins are required add $7,500.00 per each.
5). SWPPP and compliance by others.
6). This is a unit price bid and final measurements will be made at the end of job.
7). Demo concrete to be hauled off-site
8). Handicap ramps per city details
9). RKM will need 30 working Days to complete work.
1
P CASH /i 3
RECEIPT
ASDate i (1) ®g 7
a� s-rge er etiPPE LL- L.TD
Received From
DN
Lsp T6 Ws HtMc5 (PAVIiJC-d ,o, Address I>HAS %
222' r
O. Dollars$ J^
(.2 CO
7O
7.) For 6-0 fISTrut.e....T{ oµ I H SD�LT( r�N
_
V 18 ACCOUNT HOW PAID
AMT OF
CASH
ACCOUNT 1 Q
U AMT' ' t'1'2 2, 8 S, CHECK I O L B
BALANCE MONEY ORDER❑ Y
DUE ,,. CREDIT CARCO
INWOOD NATIONAL BANK 1026...,
DALLAS,TX
214/358-5281 32-104/1110
MAIN STREET COPPELL 2, LTD
4956 N.O'CONNOR ROAD
IRVING,TX 75062-2716
11/15/2013
ORDERTHE
F City of Coppell I $ **13,222.85
Thirteen Thousand Two Hundred Twenty-Two and 85/100**************************************************************
DOLLARS
City of Coppell
255 Parkway Blvd.
Coppell, TX 75019
MEMO
MSC2 -Paving Permit ApplicationIII ' L4iti-'
MAIN STREET COPPELL 2,LTD 1 026
City of Coppell 11/15/2013
Date Type Reference Original Amt. Balance Due Discount Payment
11/15/2013 Bill 111813 13,222.85 13,222.85 13,222.85
Check Amount 13,222.85
1010 Inwood-Operat MSC2-Paving Permit Application 13,222.85