DR1201-CS131107 ■
FAIN
Building Relationships
Constructing Futures
P.O.Box 750
Fort Worth,TX 76101
817.927-4388
817-927-4389 Fax
www.faingp.co
November 7, 2013
George S. Marshall, P.E.
Ernest L. Fields, P.E. Leed AP BD+C
Scott A. "Sam"Miller, PE
Larry Davis
Rodd Brann
Subject: Leveling Pad
Anchor Block Retaining Wall
Creekview Retaining Wall &Roadway Improvements
Gentlemen,
We at Fain respectfully request your consideration in the design material that we have
investigated relating to the leveling pad. The leveling pad is a non-structural member and
intended only to provide a level, flat surface for the first block course.
We at Fain are open to your consideration in the design factors of the modular wall and
what was requested in the design and placement per the construction plans for the
Creekview Drive project.
In conclusion, we feel confident with the professional opinion expressed and by the work
performed on site. Should you have any questions regarding this letter, please feel free to
contact me at your earliest convenience.
Sincerely,
Rod Lacy
The Fain Group
eD
K WATE RW411 R KS .
SUPPLY
22
L5z, , ...,,•-
Ae--/---- --,S:., ./r/
25
a
c7,/e-
_. •.7. -2
/,,; __ 'S,;'/sC° 2_5' e)A--- '. /; Z-6X7 ) /r-9
7.--.----/:
e
Zr_i l'?7,,x,f7c/_S/e-)" ' 2-e"e--'''/
)
)6. -_-,_55-,,,,,_.--9 c__, (_-_-;v-,,,,,,, /S , „,,, ,,,,,„_., z- - ...
_A/ .,-./.7 , te',),--7 /C ,//1:----)7%. ze,,os ,,,- -0_, )--7,---.)--)_,--o • ...___%--re_)
/4S
i<oref:,-`--
,/;/-//-).5.
jre 77- /) (■__5)/Y) -39--)///42, 7 ;?-:--
Local Service, Nationwide SM watervvorks.hdsupplycorn
CA ps