Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
CF-Cozby Library-LR 940427 (2)
REPORT OF CONCRETE MIX INSPECTION Report Date: April 27, 1994 Date Concrete Placed: April 20, 1994 Standard 6"x12" Client: City of Coppell Area 28.27 Square Inches Project: W.T. Cozby Public Library Contractor: Diversified Construction Services, Inc. Concrete Supplier and Plant: Texas Industries, Inc. - Plant #31 Location of Placement: Drilled Piers S~cc.' $SD ".tchWm. INSPECTION DATA MAT ERIALS n~i~ ,c~.'c,val Mix Number: 8271 Time Sample Batched: 8:53 am Cement: Time Sampled: 11:00 am Sample Location: A.4-11 Fly Ash: Truck,'ricket No: 360/209724 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 84°F Fine Aggregate: Concrete Range: 77°F Slump Range (inches): Admixtures: Weather Conditions: Partly Cloudy I Time Started: N/A 2 Time Completed: N/A Added Water: Sample Air Content (5~): No Test Total Cubic Yards Placed: 10.0 Required Strenglh (Lbs./sq.in.): 3,000 Spocim~ Measured Ag~ Da~ To,al Load Comprczsi,,~ Stnmgth R~r~ N~r SI~ (M.) (~) Tes~ eLM.) ~..'Sq.~.) WTC 11 5~ 7 04/27/94 61,220 2,170 WTC 12 5% 7 04/27/94 59,020 2,090 WTC 13 5% 28 05/18/94 88,150 3,120 WTC 14 5~ 28 05/18/94 86,420 3,060 WTC 15 5~ Hold T~t Me~ Util~ F~ ~g~ar Cylinders Madc By: V. M ·/R · G. A~M C-31 ,C-39.C-143 ~L'~ N~ O~'i~) Remarks and/or Distribution: cc: Gary Sieb - City of Coppell Mike Sherpinskas - Diversified Construction Services, Inc. Jim Bullock - F & S Partners Russell Williams - Brockette Davis Drake, Inc. ~ ~nsu~%s, I~c. Reviewed by: All ~tmm ~ ~ am f~ ~ ~d~ix~ ~ of ~ cI~m to w~ ~y am ~ms~ ~ s~ll ~ ~ m~ w-i~t ~ MI a~:al of GEE C~, ~. ~ ~ of ~ ~ m~t m~i~ ~ prior ~'fit~ a~'al. ~ ~t~ a~ ~fls a~l)- ~y to ~ s~ ~ ~:or ~ ~ a~ ~ ~safily ~fix~ of~ q~titi~ of a~ntly ~ti~l or similar ~u~.