DR1201-CR131111 T H E G 1 T Y O F
COPPELL
x A s ' a DAILY CONSTRUCTION REPORT
PROJECT: CREEKVIEW DR RETAINING II ,, v 1 3
WALL&ROADWAY DATE REPORT#
IMPROVEMENTS
DAY IM T W F S ( S
PROJECT NO. DR 12-01
WEATHER SUN 1114M OVERCAST RAIN SNOW
OWNER: CITY of COPPELL TEMP To 32 32-50 70-85 85 op
WIND Still od High Overtime Form
CONTRACTOR: FAIN GROUP HUMIDITY Dry 42, Humid Submitted? Y /N
PROJECT INSP: LARRY DAVIS
AVERAGE FIELD FORCE
NAME OF NON-MANUAL MANUAL REMARKS
CONTRACTOR/SUBCONTRACTOR
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
C es 601 Pe-di-c to)4 wo►rA & t., eX catyystril __
I�oY' /9.40'1% ,07 4 1�vr �et f /e ,/ /roc P arc. -()
/-a$ T LNo Rao 1 MCrf .,! 0,A.GGkr/'/C�i
/?/..so h 77fro wafer 1/a/v'CS afr& ae as,rs.,
SIGNATURE
ENGINEERING INSPECTOR