Villas of SW-PT131119 T H c , c; t r y . o F
ONMPINISIWYMONOIMMO
SawaWaibeiSAMSUP
COPPELL
f
CONSTRUCTION DEVELOPMENT PERMIT APPLICATION
Name of Applicant: MABAK Directional Drilling Date Submitted: October 8, 2013
Address of Applicant: 3447 McReynolds Rd. Sanger,TX 76266
Phone Number: 940-458-5337 FAX NUMBER: 940-458-3366
Location of Construction (address, if available): The Villas of Southwestern Mango Court
Subdivision Section # Block # Lot#
OR Coppell Independent School District 0.108 Acres - Volume 95033,Page 279 D.R.D.C.T.
Survey/Abstract# Acreage
Location description (attach vicinity map): 300 Southwestern Blvd
1. Type of proposed construction or development:
(){) Residential ( ) Alteration of a natural waterway drainage course
( ) Non-residential ( ) Other (describe & attach drawing or sketch)
( ) Placement of Fill(in right-of-way or on private property)
2, Description of Construction Permit requested:
( ) Paving ( ) Median or Landscaping ( ) Box Culvert
( ) Sidewalk ater Main ( ) Rip Rap
( ) Drive Approach .C.P. ( ) Fill Area
(X) Excavation Ofanitary Sewer Main ( ) Drainage Channel Excavation
( ) Fire Lane ( ) Flume ( ) Slope Protection/Retaining Wall
( ) Bridge ( ) Inlet ( ) Parking Lot
Provide an attachment containing the name and 24-hr. contact phone number
of supervisor(s) for every contractor working under this general permit.
3. All construction shall be in compliance with, but not limited to, the City of Coppell
Subdivision Ordinance, Standard Construction Details, Streetscape Plan and approved plans.
The contractors shall adhere to the City's Erosion Control& Sedimentation Ordinance.
4. Applicant shall provide a copy of approved plans, specifications and related cost estimate or
contract for the purpose of permit fee calculation verification.
CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Page 2
5. A Construction Inspection Permit Fee shall be paid prior to beginning work, in accordance
with the City of Coppell Fee Ordinance. See Page 3 for calculation formula.
Amount Due: $ '4}133 c• . 13 Date Paid: I I/ 9 / / 3
NOTE:A separate excavation permit is required anytime pavement is cut or when/there is work in the
right-of-way not approved by the City Engineer.
• Any work requiring closure of a lane of traffic, street, or alley must be approved
in advance by the Engineering Dept., with notification to the following prior to
closure:
Police Department @ 972-304-3600 Street Department @ 972-462-5150
Fire Department @ 972-304-3500 Engineering Dept. @ 972-304-3679
• Attach barricade plan / trench safety plan of a lane or street closure. (Required)
• It is a requirement of this permit that As-Built Drawings be turned in at the end of
this project. As-Builts consist of 1 set full size paper copy, 1 set full size mylar and
CD with Autocad.dwg files.
NOTE: Street closures are allowed from 9:00 a.tn. until 3:00 p.m. ONLY unless otherwise approved
by City Engineer.
A pre-construction meeting is required prior to beginning work related to this permit.
Cot :ct e inspector assigned to your project to schedule the meeting.
/1 Neil Ulmer 940-465-6821
Sign.Lure of Applicant Printed Name Contact Number
,e� & - � s-ice 71% n �
City Inspect r Contact Number(s)
FOR CITY USE ONLY
Is the fill area located in an identified flood hazard area? ( ) YES (0O
If YES, a Floodplain Development Permit is required before any construction can begin.
Is additional information required? ( ) YES TO
Are other federal, state, or local permits required? ( ) YES ( O
/l ' II • ' .ICATION APPROVED () PERMIT APPLICATION DENIED
4 t 1111 li
`/�`� pproval Date
Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand
or cause of action that may be made or come against it by reason of or if any way arising out of the closure,
blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such
permit is granted.
.... z -.,
. .”., v••• li5 en
...0 .0 v
V OD
2 = -to 0 ,.■
0 V 0 11
=
z
:/.)
•— c..) 0 4) =
P
CY') er3 'EN
l) a. E
r-4
0 .. CA
i'''•
tl) t Lat) ..E r. Z i•-■ I
C•1
o E "ZS = C ■..... .er
o ,0 ,2 0
4. ... U ,.... Z.3
E" U
0
c., ...t
4
...,
W 4— • ,,..E dm. 4. AM
(... E....
= 0 V
-C . C V
0 r ,„r 4 co
C.,) ...,
W A 0 i'S Q •■-+
•,-. >. C
— ...... 1..
— U aoc <3
4
4-• a Z Cd.. CO
C -¢ .
A ' `u 9, "0,1
c 4:, cr
.02
Op •dd. ta =
Cr. 73 0 0 CA
IL 1.....1
o _
a
11-
0 NI a. -..!
-. • cn
o -...... > 0
N.
V
>,;;3.. .... 1.3 0 I I
, t, ‘.0 003 !
co cr co 1 -4
- rio -g*"
tv co co i
E-
u100-4 4: ' C)
cri --• c in cy ■O i
0
v — 4' 4' 4— [....
' ' 1
003 •... -4
1 c...)? •s-
;,, o cs 1:1
4 .. - >
0 ,,.., .
C
Fa ...n
— 0..) r ..... ,..,.
L.
..... 4
c...) :a - :
a
.. ;R
1,... v ._, •_ Q ,•-• .:.4
-.4 4.: 0 0
c •--
a 2.,
c . .5 el Ts
;42 CD a-4 ...-, 6,
(-4 6... d., s .5 >
0 <
Z — ...,
-5 (....) 0 ci,
411. .-0 .f) > 4.; 0. t.J cv 0 cp
.44) < Ci s414 Ci
0 .4 C4 In N, NI
E-4
cn = ° ' to (.. r..I CO ,.....4
4-4 0 'E a, - ,„,, c•ii' 6' tr;
4. -.)
041 ). 0
CO ■0 CY) ,....
an •'; tz, th = a) C.)
4' 4' {A
RS
"c5 .- ,. .2
..-. c -cs s... .Z
_ 4 Or
> = V 03 a) =
B.c/B ""c) C.
a) o.•-
t
4-. t •-'"'
E
' 0 el C: .4 . .=
...1 0.•
4
r-1 If ....: .,,..,-°
E- '''' to c?
4) c --, 2 o ,,,,,
.... =
o I >"' (re
t C4
to
■••■
...
44 79, T., `C.; ti, 1,5 •,,...:
A.) 1.)
1.... (1) „,t4 g 7:7 cts 7 L./.1
."2
0 a) a .,-.; 1.. ..,
sa.,•- ...., y 0 - --
> ,.<7.,. 0
g ti)75 v GO
0- = a) L. = ats < j < E- ■-s. " f- ,.
C c
c
...,