Loading...
Townhomes Ph 2-CS131121 Rhonda Adloo From:Michael Garza Sent:Thursday, November 21, 2013 9:47 AM To:Jenny Wang Cc:Rhonda Adloo Subject:FW: I need some ifo on the Main Street 2 Townhomes paving permit, please Jenny, This City is paying the $31,294.10 portion of the project shown below so we are not charging ourselves the inspection fee. I hope this helps, If you need anything else, please let me know. Thanks, Michael Garza, P.E. Assistant Director of Engineering City of Coppell 972-304-7019 From: Bobby Stewart [mailto:bobby@csecre.com] Sent: Wednesday, November 20, 2013 4:55 PM To: Michael Garza; cmglenn@glennengineering.com Cc: Rhonda Adloo; 'Charles Cotten' Subject: RE: I need some ifo on the Main Street 2 Townhomes paving permit, please Michael, Per the RKM bid attached to the permit application, here is what we did. We took off the following….. Line 2--Pavement Removal 120 SY @ $7.00 = $840.00 Line 9—Standard Ramp 2 x $1200 = $2,400.00 Line 12—Bonds All $3,709.50 Line 14—Alley D Lime All $3,416.20 Line 15—Alley D Paving All $20,277.40 Line 16—Alley D Bonds All $651.00 Total Off $31,294.10 Total Bid is $361,865.15 less $31,294.10 = $330,571.05 X 4% = $13,222.85 Sorry for any confusion. If we miscalculated it, let us know and we can make it right. I hope this analysis helps. Let me know. Thank you. Bobby Stewart CSE Commercial Real Estate 4956 N. O'Connor Road Irving, Texas 75062-2716 Tel: 469-417-0102 Fax: 469-417-0104 Bobby@CSECRE.com The information contained in this email message and accompanying documents are legally privileged and confidential information intended only for the use of the individual or entity named herein. If the reader of this message is not the intended 1 recipient, you are hereby notified that any dissemination, distribution or copying of this message is strictly prohibited. If you have received this message in error, please notify me at the telephone number listed above. From: Michael Garza [mailto:MGarza@coppelltx.gov] Sent: Wednesday, November 20, 2013 11:24 AM To: cmglenn@glennengineering.com Cc: 'Bobby Stewart' (bobby@csecre.com); Rhonda Adloo Subject: FW: I need some ifo on the Main Street 2 Townhomes paving permit, please Mike, Im trying to understand why the contract amount and the inspection fee amount do not add up. Our Finance department has asked the questions. Even though there is a portion that is being built for the City, im not sure which one you are referring to, there still needs to be an inspection fee associated with it. If you are referring to the connection from the Swaldi development, then that normally would be considered private which would be a 2% inspection fee. I may be misunderstanding but I need some clarification so that I can relay it to our finance department. Thanks, Michael Garza, P.E. Assistant Director of Engineering City of Coppell 972-304-7019 From: Rhonda Adloo Sent: Tuesday, November 19, 2013 12:58 PM To: Bobby@CSECRE.com Cc: Michael Garza; Jenny Wang Subject: I need some ifo on the Main Street 2 Townhomes paving permit, please Our Finance Dept. has asked me to provide them a written explanation for the difference in the amount of the RKM contract for paving and the amount the 4% permit fee was based on. You mentioned yesterday it had to do with the street you are building for the City, but our auditors will want to know the details since there is a difference of $31,294.10. You can reply to this email with a short list of what was left out of the calculation of the 4% and why. This will become back-up documentation for our Finance Dept. in case of questions during our annual audit. Thanks in advance for your attention to this request, Rhonda Adloo Administrative Technician City of Coppell Engineering Dept. 972-304-3682 radloo@coppelltx.gov http://www.surveymonkey.com/s/RVXVDH6 “Building Community Through Public Service” 2