MA1009-PT131021 MINIM
MOP MIN
SMALL CONSTRUCTION SITE NOTICE
FOR THE
Texas Commission on Environmental Quality (TCEQ)
Stormwater Program
TPDES GENERAL PERMIT TXR150000
The following information is posted in compliance with Part II.E.2. of the TCEQ General Permit
Number TXR150000 for discharges of stormwater runoff from small construction sites. Additional
information regarding the TCEQ stormwater permit program may be found on the interne at:
http://www.tceq.state.tx.us/nav/permits/wq construction.html
Operator Name: JDK Associates,Inc.
Contact Name and Phone Number: James(Steve)Kenney Cell 214-850-5704 Office 940-686-6236
roject Description: Physical address or Erosion Control Improvements for
description of the site's location, estimated start `B!t �)& ca
date and projected end date, or date that disturbed 26o East Parkway Boulevaroppell,Texas 75019
soils will be stabilized
Start Date:April 2013 End Date: September 2013
Location of Stormwater Pollution Prevention Plan: On Site With Project Manager
For Small Construction Activities Authorized Under Part II.E.2. (Obtaining Authorization to Discharge)
the following certification must be completed:
I 1 r"k e j S J k 2 v∎ yped or Printed Name Person Completing This Certification)certify under
penalty of law that I have read and understand thk eligibility requirements for claiming an authorization under Part II.E.2. of
TPDES General Permit TXR150000 and agree to comply with the terms of this permit. A stormwater pollution prevention
plan has been developed and will be implemented prior to construction, according to permit requirements. A copy of this
signed notice is supplied to the operator of the MS4 if discharges enter an MS4. I am aware there are significant penalties for
providing false information or for conducting unauthorized discharges,including the possibility of fine and imprisonment for
knowing violations. •
Signature and Title �E'-S ( Date (I-1r:
i /0- l 3 Date Notice Removed
MS4 operator notified per Part II.F.3.