Loading...
Meadows Addn 6-CS100917 Rhonda Adloo From:Keith Marvin Sent:Friday, September 17, 2010 10:27 AM To:Glenn Hollowell; Ted Dutt Subject:Fwd: Coppell - Manhole @ 743 Parkway Attachments:MANHOLE REPLACEMENT - 743 PARKWAY.pdf See attached price from North Texas Contracting for the manhole replacement on Parkway. Keith >>> "Andy Nord" <andy@ntexcon.com> 9/17/2010 9:48 AM >>> Keith Please see our pricing to remove and replace the existing manhole at 743 Parkway. We are proposing to remove the existing manhole down to about 2' above the base, plug the existing 21" line and pour a replacement manhole from that point. There is also a chance that we won't have to plug the existing line if we leave the bottom in the manhole. Please let me know if you have any questions or need any more information on this. Thanks Andy Andrew D. Nord North Texas Contracting | Estimator 4999 Keller Haslet Rd. Keller, TX 76248 Phone: 817.430.9500 Fax: 817.430.9207 1 North Texas Contracting, Inc. Job Name:MANHOLE REPLACEMENT9/17/2010 Location:COPPELL, TX8:28 AM Bid Date:17-Sep-10 Bid Time:2:00 PM Revised 10/02 BidBid ItemDescription No.QtUnitUnitmount yA REMOVE / REPLCAE SS MANHOLE @ 743 PARKWAY 0.000.00 0.000.00 RMV / RPLC CONC SIDEWALK60SF 9.00540.00 RMV EXIST MANHOLE DOWN TO BASE1LS1,200.001,200.00 CIP NEW MANHOLE / CONE & RING / COVER1LS 3,300.003,300.00 IRRIGATION LINE REPAIRS1LS450.00450.00 REPLACE ST AUGASTINE SOD25SY5.00125.00 MISC LANDSCAPING REPAIR / RPLCMNT1LS300.00300.00 0.000.00 TOTAL BID AMOUNT5,915.00$ 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 5,915.00 5915.00