Loading...
Petterson (Encore)-CS131202 Rhonda Adloo From:Michael Garza Sent:Monday, December 02, 2013 3:43 PM To:Tommy D Tabor PE <TTabor@TTC-PLLC.com> (TTabor@TTC-PLLC.com); TCCI Land Development (111tcci@att.net) Cc:Rhonda Adloo Subject:impact fees Attachments:Petterson Addition (Encore of Coppell).pdf; Petterson Addition (Encore of Coppell)1.pdf Tommy, Please see attached fees. Before the plat can be signed off by the floodplain administrator the $5,763.00 will need to be paid for the roadway and park fees. This is the difference of the 7 lots vs. the previous 4 lots that have already been paid. If you have any questions, please contact me at your convenience. Thanks, Michael Garza, P.E. Assistant Director of Engineering City of Coppell 972-304-7019 1 DEVELOPMENT FEE TABLE Project:Petterson Add. (Encore of Coppell) Date: 12/2/2013 TOTALAMOUNT DUE FEES DUEPRIOR TO FILING PLAT Water Impact Fee$12,024.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee$400.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic)$2,094.75 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline)$299.25 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic)$210.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit$30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee$10,521.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee$350.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee$350.00 (100% due at Issuance of Building Permit) Park Fee$3,855.00$3,855.00 (100% due prior to Filing Plat) Roadway Impact Fee$1,908.00$1,908.00 (100% due prior to Filing Plat) Street Light FeeInformation not Available (100% due prior to Acceptance of Project) Street Sign FeeInformation not Available (100% due prior to Acceptance of Project) Construction Inspection FeeInformation not Available (100% due prior to Start of Construction) TOTAL$32,042.00 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $5,763.00 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Petterson Add. (Encore of Coppell) DATE: 12/2/2013 ROADWAY IMPACT FEE: Service Area *1 Category **Residential Land Use **Residential (Medium/Low) No. Lots/Units7 Development Units **7.00 Vehicle Miles per Development Unit **4.24 Fee per Vehicle Mile ***$150 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) =$4,452.00 * (Figure 4.1 - Roadway Impact Fee Study) ** (Table 4.10 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - The Master Fee Schedule) $2,544 was paid on 1/29/2009 AMOUNT DUE:$1,908.00