Petterson (Encore)-CS131202
Rhonda Adloo
From:Michael Garza
Sent:Monday, December 02, 2013 3:43 PM
To:Tommy D Tabor PE <TTabor@TTC-PLLC.com> (TTabor@TTC-PLLC.com); TCCI Land
Development (111tcci@att.net)
Cc:Rhonda Adloo
Subject:impact fees
Attachments:Petterson Addition (Encore of Coppell).pdf; Petterson Addition (Encore of
Coppell)1.pdf
Tommy,
Please see attached fees. Before the plat can be signed off by the floodplain administrator the $5,763.00 will need to be
paid for the roadway and park fees. This is the difference of the 7 lots vs. the previous 4 lots that have already been
paid.
If you have any questions, please contact me at your convenience.
Thanks,
Michael Garza, P.E.
Assistant Director of Engineering
City of Coppell
972-304-7019
1
DEVELOPMENT FEE TABLE
Project:Petterson Add. (Encore of Coppell)
Date:
12/2/2013
TOTALAMOUNT DUE
FEES DUEPRIOR TO
FILING
PLAT
Water Impact Fee$12,024.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee$400.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic)$2,094.75
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline)$299.25
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic)$210.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit$30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee$10,521.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee$350.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee$350.00
(100% due at Issuance of Building Permit)
Park Fee$3,855.00$3,855.00
(100% due prior to Filing Plat)
Roadway Impact Fee$1,908.00$1,908.00
(100% due prior to Filing Plat)
Street Light FeeInformation not Available
(100% due prior to Acceptance of Project)
Street Sign FeeInformation not Available
(100% due prior to Acceptance of Project)
Construction Inspection FeeInformation not Available
(100% due prior to Start of Construction)
TOTAL$32,042.00
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT
$5,763.00
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
Petterson Add. (Encore of Coppell)
DATE:
12/2/2013
ROADWAY IMPACT FEE:
Service Area *1
Category **Residential
Land Use **Residential (Medium/Low)
No. Lots/Units7
Development Units **7.00
Vehicle Miles per Development Unit **4.24
Fee per Vehicle Mile ***$150
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) =$4,452.00
* (Figure 4.1 - Roadway Impact Fee Study)
** (Table 4.10 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - The Master Fee Schedule)
$2,544 was paid on 1/29/2009
AMOUNT DUE:$1,908.00