Shadowridge P5-CS131106 DEVELOPMENT FEE TABLE Project:Shadow Ridge Estates 5 Lot 1-3 Date: 11/6/2013 TOTALAMOUNT DUE FEES DUEPRIOR TO FILING PLAT Water Impact Fee$3,006.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee$100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic)$598.50 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline)$0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic)$60.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit$0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee$3,006.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee$100.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee$100.00 (100% due at Issuance of Building Permit) Park Fee$2,570.00$2,570.00 (100% due prior to Filing Plat) Roadway Impact Fee$1,272.00$1,272.00 (100% due prior to Filing Plat) Street Light FeeInformation not Available (100% due prior to Acceptance of Project) Street Sign FeeInformation not Available (100% due prior to Acceptance of Project) Construction Inspection FeeInformation not Available (100% due prior to Start of Construction) TOTAL$10,812.50 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $3,842.00 DEVELOPMENT FEE WORKSHEET PROJECT: Shadow Ridge Estates 5 Lot 1-3 DATE: 11/6/2013 Water Impact Fee: Domestic Meter(s):2- 1 inch=3.34ESU's Irrigation Meter(s):0=0ESU's 0=0ESU's Fireline Meter(s):0=0ESU's Total #:3.34ESU's @ $900.00 ea.$3,006.00 (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #:2Connections @ $50.00 ea.$100.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #:2Domestic Meter(s) @$299.25$598.50 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) (This fee may change at the time of pick up) Irrigation/Fireline Water Meter Fee: Total #:0Irrigation Meter(s) @$0.00$0.00 Total #:0Additional Irrigation Meter(s) @$0.00$0.00 Total #:0Fireline Meter(s) @$0.00meter provided by developer (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #:2Meter(s) @ $30.00 ea.$60.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #:0Meter(s) @ $30.00 ea.$0.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's:3.34@ $900.00 ea.$3,006.00 (Due prior to issuance of building permit) Wastewater Tap Inspection Fee: Total #:2Connections @ $50.00 ea.$100.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #:2Lots @ $50.00 ea.$100.00 (100% due prior to issuance of building permit) Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved:After October 26, 1993 Park Development Zone : Zone 1 2Single-family @$1,285.00per lot$2,570.00 0Multi-family @$1,285.00per unit$0.00 (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations)$1,272.00 Street Lighting Fees: Assessed for lighting in the City's right-of-way. Information not Available This fee cannot be assessed until after Oncor submits the lighting plan for the proposed development. Once the plans are submitted, $352.44 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. Information not Available (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment.Information not Available The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: 0 DATE: 11/6/2013 ROADWAY IMPACT FEE: Service Area *1 Category **Residential Land Use **Residential (Medium/Low) No. Lots/Units2 Development Units **2.00 Vehicle Miles per Development Unit **4.24 Fee per Vehicle Mile ***$150 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) =$1,272.00 * (Figure 4.1 - Roadway Impact Fee Study) ** (Table 4.10 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - The Master Fee Schedule) AMOUNT DUE:$1,272.00