From:Michael Garza
Sent:Monday, December 09, 2013 1:56 PM
To:al.amlani@baybridgeconstruction.com
Cc:Michael Arellano; Rhonda Adloo; Mike Hodge
Subject:Shadow ridge estates
Attachments:Shadow ridge est. 5 lot 1-3r_1.pdf; Shadow ridge est. 5 lot 1-3r_2.pdf; Shadow ridge
est. 5 lot 1-3r_3.pdf
Al,
Please see attached fees for this project. Below is the link to the closest geotech report that was completed in the area.
http://weblink.coppelltx.gov/WebLink8/DocView.aspx?id=158761&dbid=1
All the impact fees will be due at the time of building permit. You will not need to pull a permit through engineering,
only through our building inspections department. We will have an inspector from the engineering department inspect
the sewer extension and service taps.
If you have any questions, please contact me at your convenience.
Thanks,
Michael Garza, P.E.
Assistant Director of Engineering
City of Coppell
972-304-7019