Loading...
Shadowridge P5-CS131209 Rhonda Adloo From:Michael Garza Sent:Monday, December 09, 2013 1:56 PM To:al.amlani@baybridgeconstruction.com Cc:Michael Arellano; Rhonda Adloo; Mike Hodge Subject:Shadow ridge estates Attachments:Shadow ridge est. 5 lot 1-3r_1.pdf; Shadow ridge est. 5 lot 1-3r_2.pdf; Shadow ridge est. 5 lot 1-3r_3.pdf Al, Please see attached fees for this project. Below is the link to the closest geotech report that was completed in the area. http://weblink.coppelltx.gov/WebLink8/DocView.aspx?id=158761&dbid=1 All the impact fees will be due at the time of building permit. You will not need to pull a permit through engineering, only through our building inspections department. We will have an inspector from the engineering department inspect the sewer extension and service taps. If you have any questions, please contact me at your convenience. Thanks, Michael Garza, P.E. Assistant Director of Engineering City of Coppell 972-304-7019 1