Acct ID: 1770 File No: C13 -0634 Date Sampled: 12/13/2013
Report Date: 12/16/2013 Sampled By: Eric Brancl-
Project: West Sandy Lake Road By Order Of:
Location: Concrete on bridge deck; Concrete on inlets Order Number: 1770
Client: City of Coppell
REPORT: Reinforcing Steel Inspection LAB NO: 155429 -1
TEST RESULTS Report No: 155429 -1
Page 1 of 1
On the basis of our visual inspection, the reinforcing steel placement meets the requirements of the project plans and
specifications.
Wall: Bicycle wall 60' east end of Phase 1
DRAWING DATE: 4 -22 -13
DETAILS REFERENCED: Pages 86 -88
Client: City of Coppell Attn: Mr. Rick O'Dell (1 -cc copy)
Ong: City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E.
Respectfully Submitted,
Alliance Geotechnical Group
S /17-�
Perry C. Kakara, CME Department Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.