Loading...
Tax 2011C-LR131211Houston 8701 John W, Carpenter Freeway Suite 250 Austin Dallas„ TX 75247 Dallas 214.678.0227 Set Cyl, 214.678.0228 San Antonio vw w hvi.com CONCRETE COMPRESSIVE STRENGTH TEST REPORT CLIENT: City of Coppell PROJECT NO.: DC1315100 816 South Coppell Road REPORT NO: C2 Coppell, Texas 75019 INSPECTION DATE: 12,3 -13 PROJECT: Tax 2011 Sandy Lake Road Pavement Repair REPORT DATE: 12 -11 -13 Page I of 3 PROPERTIES OF FRESH CONCRETE SAMPLING DATA COMPRESSIVE STRENGTH TEST RESULTS LOCATION;, Road patch at Station 97 +20, West bound outside lane Specification Field Date Sampled 12.3.13 Requirement Set Cyl, Measure Time Sampled T29 AM Area Maximum Compressive Type of Meet Yards Batched Tested Air Temp, (F) > 50 Air Temp. (n 46 Time Batched 648 AM Concrete Temp. (F) < 95 Concrete Temp, (n 83 Truck No, 8042 Slump (in.) < 4 Slump (in.) 6 1 /2a Ticket No 2004224 Air Content by Vol. ( %) 3- 6 Air Content by Vol. ( %) S.4 Yards Placed 10 Water /Cement Ratio 6.00 Water /Cement Ratio Cylinders Molded 4 Supplier TXI/ 141 28 600 Specified Strength @ 28 days: 3600 psi Mix ID: 8274 Nominal Cylinder Size (in). 6x 12 Mix Data Sup. By: Supplier Applicable ASTM Test Standards: C31, C39„ C 138, C 143, Cylinders Made By: HVJ Associates, Inc. C 172, C 173, C 1064, C232 COMPRESSIVE STRENGTH TEST RESULTS LOCATION;, Road patch at Station 97 +20, West bound outside lane Test results meet project specifications, except those marked. Remarks: Poured about 5 y3 before the slump test was finished, then stopped pouring this truck and moved to the next truck. Notified Derrick with the City of Coppell via telephone, compression machine HVJ- 08030000048 Technician: Eric Vincent ”" Aaron Pulpaneck, Laboratory /Quality Manager Texas Firm Regtration Number F- 000646 Martin J.�Iliott, P , b partment. Manager " Texas Firm Regist ion Number F- 000646 4'3aau�r letters and reports are for slue e�rcihisne iu5e of the dwrit '11le nasrr of anaur namt must reccice our prow a ntten appro%A. i iaur letters and reports apply +inh to the tnar•rnal(s( tes erd and,, or mspecred and arc not necessarnh indicative of the gnuahties of apparcntl) identical or similar material(-,), This report ma) not he reprorhtced, excelaa in fall, A,itNa�ow spar raron,n rof' 1.4V II As'mroe•e;mte +a 1, Results Set Cyl, Date Age Diameter Area Maximum Compressive Type of Meet No. No,. Tested (Days) (in..) In,Z Load (Ibs) Strength (psi) Fracture Sec. 1 967 12- 10 - -13 7 &00 28..27 107,630 3810 5 N/A 1 968 12 -10.13 7 6.00 2817 108 „570 3840 3 N/A 1 969 1231.13 28 6.00 28,27 1 970 12-31-13 28 600 2817 Test results meet project specifications, except those marked. Remarks: Poured about 5 y3 before the slump test was finished, then stopped pouring this truck and moved to the next truck. Notified Derrick with the City of Coppell via telephone, compression machine HVJ- 08030000048 Technician: Eric Vincent ”" Aaron Pulpaneck, Laboratory /Quality Manager Texas Firm Regtration Number F- 000646 Martin J.�Iliott, P , b partment. Manager " Texas Firm Regist ion Number F- 000646 4'3aau�r letters and reports are for slue e�rcihisne iu5e of the dwrit '11le nasrr of anaur namt must reccice our prow a ntten appro%A. i iaur letters and reports apply +inh to the tnar•rnal(s( tes erd and,, or mspecred and arc not necessarnh indicative of the gnuahties of apparcntl) identical or similar material(-,), This report ma) not he reprorhtced, excelaa in fall, A,itNa�ow spar raron,n rof' 1.4V II As'mroe•e;mte +a 1, Houston 8701 John W. Carpenter Freeway Suite 250 Austin Dallas, TX 75247 Dallas 214.678.0227 214.678,0228 San Antonio www,hvj.com CONCRETE COMPRESSIVE STRENGTH TEST REPORT CLIENT: City of Coppell PROJECT NO.: DC1315100 816 South Coppell Road REPORT NO: C2 Coppell, Texas 75019 INSPECTION DATE: 12 -3.13 REPORT DATE: 12-11-13 PROJECT: Tax 2011 Sandy Lake Road Pavement Repair Page 2 Of 3 PROPERTIES OF FRESH CONCRETE SAMPLING DATA LOCATION: Road patch at Station 59+ 10 Specification Field Date Sampled 12.3-13 Requirement Measure Time Sampled ---9:36 —AM Date Age Diameter Area Yards Batched Compressive Air Temp, (F) > 50 Air Temp. (F) so Time Batched 8AS AM Concrete Temp, (n < 95 Concrete Temp. (n 79 Truck No 3230 Slump (in.) < 4 Slump (in.) 4 Ticket No. 2004750 Air Content by Vol. (%) 3-6 Xr Content by Vol r (%) +8 Yards Placed 1! 0 Water/Cement Ratio - Water/Cement Ratio— - Cylinders Molded — 4 Supplier TXI/ 141 2 973 Specified Strength @ 28 days: 3600 psi Mix V 8274 Nominal Cylinder Size (in.): 6 x 12 Mix Data Sup. By: Supplier 12-31.13 28 Applicable ASTM Test Standards: C31. C39„ C138. C143, Cylinders Made By. HVJ Associates, Inc, C172, C 173, C1064, C232 COMPRESSIVE STRENGTH TEST RESULTS LOCATION: Road patch at Station 59+ 10 * Test results meet project specifications, except those marked, Remarks: Notified Dernck from City of Coppell of test results, compression machine HVJ-08030000048 Technician: Eric Vincent Aaron PulpanecK Laboratory /Quality Manager Texas Firm Martin J.. E iott PE, Texas Firm ReAstr, Number F-000646 umber F-000646 3 Our Rettcrs and reports ,%re for vhe excluine use of the chem. The use of our narne must receive our pnor %%n"cn appro%al 0ur I ettcrr and reports app h on1l) to thr fnatrmal(,wp tested and;c)r utspected and are not netesiard) in&came of the qualities of apparenth identical or smilar materral(s) 'I lus report ma) not he teprodmed, except ui full, without th,, n,n? nv 4 l AA N-mirmte, Inn Results Set Cyl. Date Age Diameter Area Maximum Compressive Type of Meet No. No, Tested (Days,) (in.) in? Load (lbs) Strength (psi) Fracture Spec. 2 971 12-10-13 7 6.00 28,27 117,000 4140 2 N/A 2 972 12-10-13 7 6.00 2817 119,030 4210 2 N/A 2 973 12-31.13 28 6,00 28.27 2 974 12-31.13 28 6.00 28.27 * Test results meet project specifications, except those marked, Remarks: Notified Dernck from City of Coppell of test results, compression machine HVJ-08030000048 Technician: Eric Vincent Aaron PulpanecK Laboratory /Quality Manager Texas Firm Martin J.. E iott PE, Texas Firm ReAstr, Number F-000646 umber F-000646 3 Our Rettcrs and reports ,%re for vhe excluine use of the chem. The use of our narne must receive our pnor %%n"cn appro%al 0ur I ettcrr and reports app h on1l) to thr fnatrmal(,wp tested and;c)r utspected and are not netesiard) in&came of the qualities of apparenth identical or smilar materral(s) 'I lus report ma) not he teprodmed, except ui full, without th,, n,n? nv 4 l AA N-mirmte, Inn LOCATION: Road patch at Station 73 +75 Page 3 of 3 Set PROPERTIES OF FRESH CONCRETE Area Maximum SAMPLING DATA Type of Specification No, Field Date Sampled 12 =113 Fracture Requirement 3 Measure Time Sampled 2:50 PM 2 N/A 3 976 12 -10.13 7 6.00 Yards Batched 4510 Air Temp. (F1 > 50 Air Temp. (F) 73 Time Batched 1:44 PM Concrete Temp. (F) < 95 Concrete Temp. (F) 79 Truck No, 3850 Slump (in,) < 4 Slump (in..) _ 4 Ticket No. 20005959 Air Content by Vol. ( %) 3. 6 Air Content by Vol. ( %) 33 Yards Placed 10 Water /Cement Ratio - Water /Cement Ratio Cylinders Molded 4 Supplier. TXI/ 141 Specified Strength @ 28 days: 3600 psi Mix ID: 8274 Nominal Cylinder Size (in): 6 x 12 Mix Data Sup. By° Supplier Applicable ASTM Test Standards: C31, C39, 0138, C143u Cylinders Made By: HVJ Associates„ Inc. 0172, C173,0064, 0232 COMPRESSIVE STRENGTH TEST RESULTS LOCATION: Road patch at Station 73 +75 compression machine HVJ -08030000048 Technician: Eric Vincent Aaron Pulpaneck, Laboratory/Quality Manager 'T'exas Firm ( ur h^r¢ers reseal reports are fair the a clus ne tune of tlue cheat. 'Flie use of our name im st recedce our Prior %%titten Ippro%al. Our le"eva and iteport.s appl) onhd to the maitn 0(i) temed and ,`or inspe r-d and are not necessa,nk andir.am a of the quahtdes of apparently identical or similar nnateria4s,). Thiva repofft MR) not be ueprauduced, ewrcept in fin),, uatho: w fheernan�e ^antn l XA lssenreare% Britt Results Set Cyl. Date Age Diameter Area Maximum Compressive Type of Meet No, No. Tested (Dff s) (in ) in? Load (Ibs) Strength (psi) Fracture Spec. 3 975 12 -10 -13 7 6.00 28.27 130,400 4610 2 N/A 3 976 12 -10.13 7 6.00 28.27 127,480 4510 2 N/A 3 977 1231 -13 28 6.00 2827 3 978 12 -31.13 28 6.00 2817 * Test results meet project specifications, except those marked. Remarks: Notified Derrick from the City of Coppell of test results, . compression machine HVJ -08030000048 Technician: Eric Vincent Aaron Pulpaneck, Laboratory/Quality Manager 'T'exas Firm ( ur h^r¢ers reseal reports are fair the a clus ne tune of tlue cheat. 'Flie use of our name im st recedce our Prior %%titten Ippro%al. Our le"eva and iteport.s appl) onhd to the maitn 0(i) temed and ,`or inspe r-d and are not necessa,nk andir.am a of the quahtdes of apparently identical or similar nnateria4s,). Thiva repofft MR) not be ueprauduced, ewrcept in fin),, uatho: w fheernan�e ^antn l XA lssenreare% Britt ASSOCIATES Houston 870011 John W. Carpenter Freeway S Ausft DaSas, TX 75247 Dallas 21408.0227 214.678.0228 San Antotdo www.frvl.corl ASTM D 1633 (A) CLIENT: City of CoppeN PROJECT NO.: 816 South Coppell Road REPORT NO: CoppeN, Texas 75019 PROJECT: Tax 2011 Sandy Lake Road Pavement Repair DATE SAMPLED: REPORT DATE: DC1315100 CTB3 II -19 -13 11 -26.13 Page 1 of 1 Set Cyl. Date Age Diameter Height Area Maximum Compressive Results Meet - No. No. Tested (Days) in. (in, Load (b) Sengh (ps), Spec 1 946 11-26-13 7 4.00 458 1257 11,600 92S N 1 947 11 -26-13 7 4.00 4.58 1257 15,890 126S N °AVERAGE COMPRESSIVE STRENGTH: 1095 * Test results meet project specifications, except those marked Remarks: Cyfinders were cured M accordance with ASTM D 1632 Compression machine HVJ- 08030000048 Field Technician- EdL)Ow&M Lab Technician: MQghtlAft .Aaron PulLaborato panedc. ry /Quality Manager Texas Firm Registration Number F4)00646 Martin J. #ott, PE, �entMunager Texas Firm Registration Number F- 000646 Our letters and «pom are f the and are,r o use es the then' 'ne use of our name must ene our Arun wntten approtal. Our ktters and reports apph only to the maternhn sealed amine . 1ed and are not nectxsari y indicator of the i4uahars of appatent4 sientaal or sundar mamodrs) nis report may not be reprod ned, except in ri,al uifhrnat Ih,� nirnwrm of NVI A® iat Inr