Loading...
CF-Cozby Library-LR 940520 (12) REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOH~ Method: ASTM D2922 D3017 D698 Page 1 of 2 Client: City of Coppell Material De~ription Maximum Optimum Dry Moisture DensiVa' Content Project: W.T. Cozby Library (Lbs/Culq) Percent Test Date: April 1 !, 1994 1. Select Fill: Reddish Brown Clayey Sand 112.5 13.2 Report Date: May 20, 1994 2. Required Density (%): 95% to 105% 3. Required Moisture (%): ±3% Optimum 4. Mat Location/Elevation (and/or) Lift In-Place In-Place Percent No. Dr)' Density Moisture Compaction Test CLbs/CuFt) Content (%) No. Probe Depth 1 Building Pad Select Fill - 4* Lift 56 107.6 11.8 95.6 6" 30' east and 24' north of southwest comer 1 Building Pad Select Fill - 4* Lift 57 107.5 11.2 95.6 6" 50' north and 24' east of southwest comer 1 Building Pad Select Fill - 4th Lift 58 107.1 12.9 95.2 6" 30' east and 45' south of northwest corner 1 Building Pad Select Fill - 4th Lift 59 114.8 10.3 102.0 BS 9' south and 50' east of northwest corner 1 Building Pad Select Fill - Final Lift 60 117.2 11.8 104.2 BS 70' north and 80' west of southeast comer 1 Building Pad Select Fill - Final Lift 61 116.2 12.2 103.3 BS 45' north and 125' east of southwest corner Above Test Results Meet Specification Requirements GEE Consultants, Inc. (214) 620-9791 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Method: ASTM D2922 D3017 D698 Page 2 of 2 Client: City of Coppeil Material Deseriotion Maximum Optimum D~' Moisture Density Content Project: W.T. Cozby Library (Lbs/CuFt) Percent Test Date: April 11, 1994 1. Select Fill: Reddish Brown Clayey Sand 112.5 13.2 Report Date: May 20, 1994 2. Required Density (%): 95% to 105% 3. Required Moisture (%): +3% Optimum 4. btat Locatioru'Elevation (and/or) Lift In-Place In-Place Percent Test No. DO' Donsity Moisture Compaction No. (Lbs;CuF0 Content (~) Probe Depth 1 Building Pad Select Fill - Final Lift 62 112.9 13.2 100.4 BS 42' north and 100' west of southeast corner 1 Building Pad Select Fill - Final Lift 63 114.7 13.9 102.0 BS 54' west and 24' west of northeast corner 1 Building Pad Select Fill - Final Lift 64 107.8 14.7 95.8 6" 100' west and 60' south of northeast corner 1 Building Pad Select Fill - Final Lift 65 113.9 10.2 I01.2 6" 60' north and 45' west of southeast comer 1 Building Pad Select Fill - Final Lift 66 104.6 11.7 93.0* 6" 30' west and 45' north of southeast comer 1 Building Pad Select Fill - Final Lift 67 113.0 11.3 100.4 6" 24' west and 12' south of northeast comer * Does not meet density specification requirements cc: Gary Sieb - City of Coppell Mike Sherpinskas - Diversified Construction Services, Inc. Jim Bullock - F & S Partners Robert Williams - Brockette Davis Drake, Inc.