Loading...
Shadowridge P5-CS131218 Rhonda Adloo From:Michael Garza Sent:Wednesday, December 18, 2013 4:33 PM To:Rhonda Adloo Subject:RE: 2 more things Ill touch base with Eastlake. I had told Ali and his contractor that he didn’t need a permit through us or a pre-con, I told him just to pull a permit through building inspections. Michael Garza, P.E. Assistant Director of Engineering City of Coppell 972-304-7019 From: Rhonda Adloo Sent: Wednesday, December 18, 2013 4:28 PM To: Michael Garza Subject: 2 more things 1)Eastlake (BT Land Dev) still hasn’t brought their checks in from last Friday’s pre-con, said they would be here Monday, then yesterday… 2)Ali Amlani paid the road & park fees for Shadowridge Est 5 & wants to get the pre-con scheduled ASAP Rhonda Adloo Administrative Technician City of Coppell Engineering Dept. 972-304-3682 radloo@coppelltx.gov http://www.surveymonkey.com/s/RVXVDH6 “Building Community Through Public Service” 1