Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Eastlake-PT131226
T M [ . C 1 T Y O F COPPELL A g: W; CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Name of Applicant Coppell Partners 22,LP Date Submitted 12-16-2013 Address of Applicant 5055 Keller Springs Rd,Ste 545,Addison,Texas 75001 Phone Number 214-478-9777 Fax Number N/A Location of Construction (address, if available): —2400' West of SH 121 and Denton Tap Rd Subdivision EAST 1.A K E Section# Block# Lot # OR Survey/Abstract# 1327 Acreage 22.006 Location description (attach vicinity map): —2400'West of SH 121 and Denton Tap Rd intersection 1. Type of proposed construction or development: C: Residential C Alteration of a natural waterway drainage course C Non-Residential C Other(describe&attach drawing or sketch) C Placement of Fill(in right-of-way or on private property) 2. Description of Construction Permit requested: p Paving ❑ Median or Landscape ❑ Box Culvert p Sidewalk p Water Main ❑ Rip Rap ❑ Drive Approach p R.C.P. p Fill Area p Excavation p Sanitary Sewer Main ❑ Drainage Channel Excavation ❑ Fire Lane ❑ Flume p Slope Protection/Retaining Wall ❑ Bridge p Inlet ❑ Parking Lot Provide an attachment containing the name and 24-hr. contact phone number of supervisor(s) for every contractor working under this general permit. 3.All construction shall be in compliance with, but not limited to, the City of Coppell Subdivision Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The contractors shall adhere to the City's Erosion Control& Sedimentation Ordinance. 4.Applicant shall provide a copy of approved plans, specifications and the related cost estimate or contract for the purpose of permit fee calculation verification. CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Page 2 5.A Construction Inspection Permit Fee shall be paid prior to beginning work, in accordance with the City of Coppell Fee Ordinance. See Page 3 for calculation formula. Amount Due: $49,045.08 Date Paid: 12-16-2013 NOTE:A separate excavation permit is required anytime pavement is cut or when there is work in the right-of-way not approved by the City Engineer. I-Any work requiring closure of a lane of traffic, street, or alley must be approved in advance by the Engineering Dept., with notification to the following prior to closure: Police Department @ 972-304-3600 Street Department @ 972-462-5150 Fire Department @ 972-304-3512 Engineering Dept. 972-304-3679 >Attach barricade plan /trench safety plan of a lane or street closure. (Required) ➢It is a requirement of this permit that As-Built Drawings be turned in at the end of this project. As-Builts consist of 1 set full size paper copy, 1 set full size mylar and a CD with Autocad.dwg files. NOTE:Street closures are allowed from 9:00 a.m.until 3:30 p.m.ONLY unless otherwise approved by City Engineer. YA pre-construction meeting is required prior to beginning work related to this permit. Contact the inspector assigned to your project to schedule the meeting. Printing y• e indicates your acceptance of the terms and conditions of this form: 214 914 9809 'eD Signature o Ap. icant Contact Number 1111111 CO G 1-1D Signature of u spector Contact Number FOR CITY USE ONLY Is the fill area located in an identified flood hazard area? 5'es C' No If YES, a Floodplain Development Permit is required before any construction can begin. Is additional information required? C Yes X10 Are other federal, state, or local permits required? C Yes Seyo }[PERMIT APPLICATION APPROVED C PERMIT APPLICATION DENIED City • .;ro Date Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. T K `__A- C i T v • o f Page 3 COFFELL d' A 6 ' j b INSPECTION FEE CALCULATION SHEET Project Name Eastlake Date 12-16-2013 As per the City of Coppell Subdivision Regulations,the Developer shall pay 4%of the cost of the items to be permitted and inspected by the Engineering Department and dedicated to the City. The Developer shall pay 2% of the items to be inspected by the Engineering Department,but not dedicated to the City such as parking lots,private utilities,private drainage systems and so forth. Inspection fees are due on or before the date of the Pre-construction Meeting. In order to verify the inspection fee due, please provide a copy of the development contract(s) and this spreadsheet with completed calculations to the Engineering Dept. The contract(s) should indicate the cost to construct the following improvements: PUBLIC IMPROVEMENTS U PRIVATE IMPROVEMENTS o CONTRACT AMOUNT X 4/o= CONTRACT AMOUNT X 2/o= Paving 418,434.66 16,737.38 0 0 Water ,208,314.95 8,332.59 0 0 . -° Sanitary Sewer !102,432 4,097.28 0 0 Storm Sewer #257,130 10,285.2 0 0 Alleys 0 0 0 0 Sidewalks 48,813.24 1,952.53 0 0 Other 0 0 M_ 7,640.3 Total 41,404.97 7,640.3 Grand Total(total of 49,04528 both colored fields) Submit by E-mail Print Form I 1 cases 12./2 ' 096735• RECEIPT Date . 1.. . .. . . Received`From" �? C-4 : 44-2 p.4Tl, i `.�+c. F �2 > -P• Q ,— • Address ER ST k Al)Ll Ti bbl• 1Q � o V eg 0 N _ : Dollars. o -a For•CO 1 4 67r7:.. ' 0/►/ /l1f.f '4LTZ oAl F�&S 'Al ACCOUNT HOW PAID AMT 9F...' m ACCOUh... CASH / U AMT P•�.�.-�� CHECK !D �� I :::::::::',. 5 .::::4:-' ITIS ii I] PY - ..• L ______ _ _.TRUEWnm,NApK.K.11.:'.HOLDTo4GMCIAVIEW- NFATSENS fEflAGEPISnVP.145'rtNNFAy M ..P.a 1011 COPPELL PARTNERS 22 LP 5055 KELLER SPRINGS RD STE 545 ADDISON,TX 75001 • ' PAY �+� n DATE `4 -k�-1t 32-1797-1110 TO THE ORDER OF C� l� OF �1PY 6%,(J-, ZS �'Ot-(�1 NINE Tt-IOUS�1vrn R-N f) �fLT� 1-I V DOLLARS 8 Q TEXAS CAPITAL BANK" Z-c� •c' C�Houston,Texas f� / /� r 0...E3® 1 FOR ) �SYl:ckO Lt' 3 . 7-'; Bid Form Eastlake Coppell, Texas December 12,2013 Item No. Description Unit Quantity Unit Price Amount Division I-Clearing&Grading 1 Clearing&Grubbing AC 22 4,550.00 100,100.00 2 Excavation(incl.ROW,lots/blocks,transitions,&pond per plan) CY 130,500 1.91 249,255.00 3 Erosion Control Construction Entrance EA 1 2,000.00 2,000.00 4 Rough Lot Grading EA 58 195.00 11,310.00 5 Final Lot Grading EA 58 75.00 4,350.00 6 Dewatering LS 1 15,000.00 15,000.00 Total Bid Division I- Clearing&Grading. Coppell Partners 22,L.P. Page 1 of 1 12/16/2013 Bid Form Eastlake Coppell, Texas December 12,2013 Item No. Description Unit Quantity Unit Price Amount Division III-Paving 1 6"Street Pavement SY 9,569 $31.85 $304,772.65 2 6"Street Pavement-Parallel Parking Spaces SY 605 $40.00 $24,200.00 3 6"Subgrade Preparation SY 11,191 $2.49 $27,866.59 4 Hydrated Lime TON 224 $136.85 $30,630.86 5 Sawcut Existing Pavement and Remove Curb LF 88 $7.20 $633.60 6 Pavement Header(At Columbus) LF 28 $8.56 $239.68 7 Barrier Free Ramps EA 10 $998.81 $9,988.10 8 Street Barricade(Type Ill) LF 28 $29.32 $820.96 9 Street Light EA 9 no bid no bid 10 Street Name Signs(2 blades per) EA 5 $347.75 $1,738.75 11 Combination Street Name Signs(2 blades per)&Stop Sign(R1-1) EA 5 $401.25 $2,006.25 12 Traffic Control LS 1 $2,675.00 $2,675.00 13 5'Sidewalk LF 954 $17.05 $16,265.70 14 6'Sidewalk LF 462 $20.36 $9,406.32 15 8'Sidewalk (including grading per plan) LF 818 $28.29 $23,141.22 16 Stamped Concrete Crosswalk SY 22 $205.44 $4,519.68 17 Parking Striping LS 1 $1,070.00 $1,070.00 18 Handrail LF 310 no bid no bid 19 Testing LS 1 no bid no bid Subtotal Paving: $459,975.36 Payment,Performance,and Maintenance Bonds $7,250.00 Total Bid Division III- Paving: $467,225.36 Coppell Partners 22,L.P. Page 1 of 1 12/12/2013 Bid Form Eastlake Coppell, Texas December 12,2013 Item No. Description Unit Quantity Unit Price Amount Division II-Water Distribution,Sanitary Sewer,and Storm Drainage Systems Water Distribution System 1 8"PVC Waterline(including blocking,fittings,bends,tees,&plugs) LF 3,381 $23.40 $79,115.40 2 8"Gate Valve&Box(including blocking) EA 17 $1,085.00 $18,445.00 3 12"x8"Tapping Sleeve&Valve EA 1 $4,775.00 $4,775.00 4 Fire Hydrant Assembly(including lead,tee,valve,and blocking) EA 7 $3,590.00 $25,130.00 5 Adjust Exist 12"valves along 121 EA 3 $160.00 $480.00 6 1"Irrigation Service(meter by others) EA 2 $1,385.00 $2,770.00 7 1"Single Water Service EA 58 $1,230.00 $71,340.00 8 Remove Plug and Connect to Existing 8"Waterline EA 1 $800.00 $800.00 9 15"PVC Sleeve(for proposed wall crossing) LF 45 $80.00 $3,600.00 10 Trench Safety LF 3,381 $0.10 $338.10 11 Pressure Test and Chlorination LF 3,381 $0.45 $1,521.45 12 Geotechnical Testing LF 3,381 no bid no bid Subtotal Water Distribution System: 4208,314.95 Coppell Partners 22,L.P. Page 1 of 4 12/12/2013 Item No. Description Unit Quantity Unit Price Amount Division II(cont.)-Water Distribution,Sanitary Sewer,and Storm Drainage Systems Sanitary Sewer System 1 8"PVC Sanitary Sewer Line LF 2,260 $19.90 $44,974.00 2 4'Diameter Manhole EA 10 $2,450.00 $24,500.00 3 4'Diameter Manhole on Existing Line EA 1 $2,900.00 $2,900.00 4 4"Sanitary Sewer Service EA 58 $434.00 $25,172.00 5 Concrete Encasement(8"Line) LF 80 $30.00 $2,400.00 6 Trench Safety LF 2,260 $0.10 $226.00 7 Testing LF 2,260 $1.00 $2,260.00 8 Geotechical Testing LF 2,260 no bid no bid Subtotal „ -Sanitary Sewer System: 02 432.00 Coppell Partners 22,L.P. Page 2 of 4 12/12/2013 Division II Bid Summary Subtotal-Water Distribution System: $208,314.95 Subtotal-Sanitary Sewer System: $102,432.00 Subtotal-Storm Drainage System: 46,830.00 Payment,Performance,and Maintenance Bonds $60,3oo.00llr Total Division II- Water Distribution,Sanitary Sewer,and Storm Drainage Systems: $567,876.95 Coppell Partners 22,L.P. Page 4 of 4 12/12/2013 1 P •CASH 'i2. �3 096736 ` RECEIPT �1�1'©ate ��/� / o Received Frofn o fae L__ Ppei : 1 22:,; L P a. t^o N Address S � I� A-Do(Tf ,, J(�(}(�.DO O m x N DOflars$L;S o . -n For • kf.A C� t 1. 1 pAC--�" F '^L T :4aa°' Y V tw ACCOUNT, HOW PAID • AMT 9F, / CASH. • o ACGOU p AMT, r, i .: �rt �0 CHECK ' l - e raoN T I:D �q4 ". .. CREDIT AISO _:.,' .,..._,. . ., ..,: ' ; <;). ., ;[- ,...,_. F9 . 1009 COPPELL PARTNERS 22 LP 5055 KELLER SPRINGS RD STE 545 11 ADDISON,TX 75001 - DATE 1.) -C.--C [9 '1.3 32-1797-1110 PAY T /� 8 TO THE Cv-rH c CD-P�,� L✓ •ORDER OF OO 5 I I ICS\'K -MO Ou.sei J ekh) 1'r}- ik.)T QtW Br C.IC b DOLLARS Lel • O TEXAS CAPITAL BANK'" / it Houston,Texas FOR1 Cyr L//L( /i/ / IL // s.'ra',7 'a' i • v