Eastlake-PT140106 H E C 1 T Y O F CT
�(,,-", -
* 'fi p ia• q'T-i
A g 1
FLOODPLAIN DEVELOPMENT PERMIT o y 1' I Z—i I
Z
PERMIT NO.
NAME OF PERMITEE: BT Land Development
The above named permitee applied for a FLOODPLAIN DEVELOPMENT PERMIT on Eastlake Subdivision
The application has been reviewed by the FLOODPLAIN ADMINSTRATOR and it has been determined that the proposed
development is located within an identifiable floodplain of:
Denton Creek
The FLOODPLAIN ADMINISTRATOR has reviewed plans and specifications of the proposed development for conformance
with the development standards required by Floodplain Management Ordinance #2001-952. You are hereby authorized to
proceed with the following described work:
Reclaim a portion of the property per CLOMR to build a 58 unit residential subdivision
To maintain compliance with the development standards of Floodplain Management Ordinance#2001-952 and to eliminate or
minimize flood damage potential to the proposed development, you are hereby directed to construct your proposed
development in accordance with the following special provisions:
Compliance with the development standards of Floodplain Management Ordinance #2001-952 including but not
111 limited to:
• For residential structures,the lowest floor(including basement) must be elevated to two (2) feet above the 100-
year base flood elevation or one(1)foot above ultimate condition whichever is higher. Certification of the lowest
floor must be submitted from a registered professional engineer,architect,or land surveyor.
• For non-residential structures,the lowest floor(including basement)must be elevated or flood-proofed to two(2)
feet above the 100-year base flood elevation or one (1) foot above ultimate condition whichever is higher.
Certification that the flood-proofing methods are adequate to withstand the flood depths, pressure, velocities,
impact and uplift forces and other factors associated with the base flood must be submitted from a registered
professional engineer or architect.
• For fill activities,the permittee must submit certification from a registered professional engineer or land surveyor
that the level of the compacted fill materials is at or above the elevation of the Base Flood.
�2 Certified copy of all final plans or As-Built Drawings must be submitted to the FLOODPLAIN ADMINISTRATOR.
( ) OTHER PROVISIONS:
' ,
L. a 4.
shape �}� �a- �� 0013
cknowledgement of Conditions by Permittee Printed Name Date
�'2 01tu4A-rLC�,a-tt zit , P. .,c coy( t --& -ZDILI
� Date
Si' ?ODPLAIN ADMINISTRATOR Printed Name