Loading...
Villas of SW-PT140110 A copy of the approved permit must be on the job site at all times. CC: Applicant T x r a L r r : o ' Page 1 of 4 Public Works COPPELL Permit File Rev. 06/2012 r r ,. � G 1-10-1 4 A09 :22 I N Orig. to Project File r , A . D Q D n RIGHT-OF-WAY USE PERMIT APPLICATION Permit valid for 90 calendar days from date of approval Submit permit application to the Engineering Dept.,Town Center,255 Parkway Blvd.or e-mail to engineer @coppelltx.gov(see button below) Date of Submittal: 1/9/14 Applicant's Job# /Work Order#7PFT9PE PERMIT FEE: $100.00 (No charge to Utility Companies with approved Franchise/ROW Use Agreement) Refer to the City of Coppell Ordinance No. 2001-944. Certificated Telecom Provider? Yes a No C [] Plans provided and approved (Erosion Control/Safety fences must be installed prior to beginning work) Project Name/Location or address 272 SOUTHWESTERN General Contractor HENKEI:,S AND MCCOY Contact St E-mail address to return permit Paul.m.me s senheimerOve ri zon.cam • Representative: Paul Messenheimer Franchise r Telephone#: 214-437-1090 Company: E-mail address:Paul.m.messenheimertiveriz on corn (for contact if needed/if e-mail of approved permit is desired/permit cannot be e-mailed unless complete) Utility Company Represented: t' Oncor Electric Delivery C Atmos Energy ( Verizon C SBC/ AT&T C' Time Warner Cable C CoSery Electric/Gas f Other General Description of Work(in accordance with ord.No.2001-944):PLEASE ATTACH PLAN OF PROPOSED WORK BORE IN APPROX 500'of 1.5 SUBDUCT AND SET 4 HANDHOLES TO PROVIDE SERVICES TO THE NEW HOMES AT 272 SOUTHWESTERN Estimated Start Date 1/27/14 Estimated Completion Date*2/15/14 * Completion requires submittal of Completion Verification Notice (see page 4) :-Was contact made with City and/or utility companies to locate existing utilities? if NO, Reason: C Yes C No %Is removal of existing streets, alleys, or sidewalks necessary? C Yes C No if YES,project must have City inspection prior to concrete replacement Rift-of-Way Use Permit Application Page 2 of 4 Representative(s)of the Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests may be required at applicant's expense)and barricading according to the Texas Manual on Uniform Traffic Control Devices. Areas) affected must be restored to as good conditIun n .kefore the commencement of work (grading, drainage, vegetation,and erosion control). To schedule Public Works final inspection (Page 4)call 972-462-5155. >Any excavation requiring closing of a street/alley must be reported prior to closing to the following: Police Department 0 972-304-3600 Fire Department @ 972-304-3512 Street Department 0 972-462-5150 Engineering Department 0 972-304-3679 Attach barricade plan/trench safety plan if a lane or street closure is required. NOTE: Street closures are allowed from 9:00 a.m.until 3:30 p.m.ONLY unless otherwise approved by City Engineer. >Attach Work Order(franchise only)and/or 1 set of prints showing proposed work. Locates for existing franchise utilities must be done 48 hours prior to beginning;work. For City,utility looates, call 972-462-5155 to,schedu e,48 hoursprior to beginning work. The application with signatures of Franchise and Contractor representatives must be submitted to Engineering Dept.for approval prior to beginning work. Submittals by e-mail should go to engineerOcoppelltx.gov. Printing your name indicates your acceptance of the terms and conditions of this form: (if you want the approved permit returned via e-mail,provide a valid e-mail address on Page 1.) PAUL MESSENHEIMER 1/9/2014 Signature of Utility Company Representative Date Signature of Contractor Representative Date Signa re o- ity Representative Date Comments NOTE: Notify City Inspector at 972-304-3679 prior to beginning work and prior to backfill for concrete, trench, ditch and open pit inspections. Backfill must meet all construction standards approved by the City of Coppell. Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. 0 b. :a 1111111111111W ...-- N o n co z .P z x) O W N m -I N C rn p c� -o /� (.5C73 3 z 0 / / 802 rm Ir m / / i• = m o / +/ / ,, i --I D ..- / / / 'Ln '/i. /,,," 806 W o / % /i 9, / / to o -n / /'/ cu a 272 / �!1 m ' LE m 1 4t m // �,' % 810 o n ' 7 z i'rof /0) • cO ,c2 7 b o /+\- , 0) o z ,I�� • 1 MANGO S T I -*) o s•wig -i a --.-'- -----�- -pT'� I Pig38 - m o '�'! En s 826 7�! ! 822 818 814 II m I j m `1 Z n < aC R.O.W. 46 Z z° � v � I -i-Y ° -1Z O Tr01 'I 13-3 1 .• D r a, m x -c r Sr) U, -1 ° n0 i I w o =', mb I o z n X -1x02 , I O m x D I f z o = i m r 3 I -C p I D mco i Z I n o m r 1 co_ mOxl I -4 I m z m I 3 -` l z / Cl t I o 7 I i I lr I I I I 17x30 i I i I i; I m 304 274---_r-1 i 268 rn � r r �' -n 0 -1 --I X o m SOUTHWESTERN BLVD I'''' s -i i-a .• ,p N O -o • V m Z z m3:, N �—Z o (.0 O xi `0 X/ c n1 N ao G7 x 0 -1 m •• • ,...3> v _p 0 0 • -I n*CI z 33 D 133 -In 3 Z .. m< m z z o m -0 rn m •• „ . N •• n al ]: w npA m Q _- D • x --I `I n S>O 'O VT—N m a).. . N D r) m m .. � p . . m I: ' a3 s) _i 0 x m ma n