PROJECT: Andrew Brown Park Job No.: 25-02-92-06928-02
CLIENT: Tony Crawford Construction Date: 9/8/92
REMARKS: An ATEC technician traveled to the job site to perform field density testing on the fill placement.
When he arrived he was informed that the dirt contractor had not cotton enough fill placed to test, so the technician
returned to the office.
TOTAL TIME: 1.0
ATEC REPRESENTATIVE: Bill Holt