Loading...
Riverchase Montessori-CS140113 T H E C 1 T Y O F COPPELL A S , 8 January 13, 2014 Chris Raines Archistructure, Inc. Chris@archistructure.com RE: Riverchase Montessori School Addition PRE-CONSTRUCTION MEETING Dear Mr. Raines: A pre-construction conference on the referenced project has been scheduled for Wednesday, January 15, 2014 at 10:30 a.m. in the Main Engineering conference room at 265 Parkway Blvd. Please notify the franchised utility companies, contractors, sub-contractors, testing lab and any other interested parties so that they may have a representative present. If you have any questions concerning this project prior to the scheduled meeting, feel free to contact me at(972) 304-7090. Sincerely, 7/;_404i1// j./ Rick O'Dell, Construction Inspector Office Phone: 972-304-7090 Fax: 972-304-3570 rodell@cop_pelltx.gov cc: Pre-con group 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 RESPONSIBILITY FOR PRE-CONSTRUCTION MEETING NOTIFICATION The owner/owner's representative will be notified of the date, time and place of the pre-construction meeting once it is scheduled by the Construction Inspector assigned to the project. It is the owner/owner representative's responsibility to notify the following parties: • Franchise Utilities (including but not limited to electric, gas, cable, & telephone providers) • Geotechnical firm • Project Engineer • Contractors or subcontractors for excavation, utility, & paving operations • SWPPP representative