CF-Andrew Park 2-LR 920909ATEC Associates, Inc.
11356 Mathis Avenue
Dallas, Texas 75229
(214) 556-2204
METRO 263-1681
FIELD DENSITY TESTS
Project Naae: Andrew BrounPark ATEC Job No.: 25-02-92-06928-03
CLient Name: Tony CraHfordCor~t. CLient Job No.:
General Contractor: Date: 9/9/92
Test No. Moisture X Dry Density Proctor ~ of Proctor Pass Fait Fait ELevation/ Location
(PCF) No. Compaction Hoisture Refer F.G. Grid Coordinates
Spec Actual or Roaduay Station
1 20.5 102.6 1677 90 95.4 X -1~ F.G. North beautification berm
2 18.6 106.0 1677 90 96.7 X -1~ F.G. North beautification berm
3 20.7 103.7 1677 90 96.4 X -1~ F.G. North beautification berm
6 19.5 102.3 1677 90 95.0 X -1~ F.G. North beautification berm
(1) Test Location EstabLished by: Grid Lines [~ Control Points [~-- Estimation l---] Contractor []
(2) Depth or Etev. of Test EstabLished by: Survey I---] Grade StakesI J Estimation [] Contractor []
') Test Conducted on: Futt Time Basis [-~ Intermittent Basis ~-~
Proctor No. Maximum Density (PCF) Opt. Moisture (~) Stand. Proctor Mod. Proctor Total Time:
!677 107.6 17.6 r--I
[] [] ATEC REPRE~#TATIVE BiLL HoLt
Remarks: Respectfulty Sul~nitted,