Loading...
CF-Andrew Park 2-LR 920909ATEC Associates, Inc. 11356 Mathis Avenue Dallas, Texas 75229 (214) 556-2204 METRO 263-1681 FIELD DENSITY TESTS Project Naae: Andrew BrounPark ATEC Job No.: 25-02-92-06928-03 CLient Name: Tony CraHfordCor~t. CLient Job No.: General Contractor: Date: 9/9/92 Test No. Moisture X Dry Density Proctor ~ of Proctor Pass Fait Fait ELevation/ Location (PCF) No. Compaction Hoisture Refer F.G. Grid Coordinates Spec Actual or Roaduay Station 1 20.5 102.6 1677 90 95.4 X -1~ F.G. North beautification berm 2 18.6 106.0 1677 90 96.7 X -1~ F.G. North beautification berm 3 20.7 103.7 1677 90 96.4 X -1~ F.G. North beautification berm 6 19.5 102.3 1677 90 95.0 X -1~ F.G. North beautification berm (1) Test Location EstabLished by: Grid Lines [~ Control Points [~-- Estimation l---] Contractor [] (2) Depth or Etev. of Test EstabLished by: Survey I---] Grade StakesI J Estimation [] Contractor [] ') Test Conducted on: Futt Time Basis [-~ Intermittent Basis ~-~ Proctor No. Maximum Density (PCF) Opt. Moisture (~) Stand. Proctor Mod. Proctor Total Time: !677 107.6 17.6 r--I [] [] ATEC REPRE~#TATIVE BiLL HoLt Remarks: Respectfulty Sul~nitted,