Loading...
Duke Lesley 2RC-CS140114 Rhonda Adloo From:Michael Garza Sent:Tuesday, January 14, 2014 4:47 PM To:Russell Bennett; jdjr@jdjr.com Cc:Rhonda Adloo Subject:RE: 4 Points Hotel Coppell Attachments:Construction Development Fillable.pdf; Duke Lesley 2RC-CS130809.pdf Russell, It looks like we approved plans back in August but never received a final submittal. Attached is the impact fee assessment. The roadway impact fee was waived but the water and wastewater fees need to be paid at the time of building permit. The construction development permit (civil site work) attached needs to be filled out and submitted along with the inspection fees as stated on the last page of the permit. Once these inspection fees are paid we can set up a pre-con. Jim, can you send me a pdf of the plans so that I can take a look at them one last time before you submit final sets. We will need 3 sets for our use and however many the contractor will need for construction. If you have any questions, please contact me at your convenience. Thanks, Michael Garza, P.E. Assistant Director of Engineering City of Coppell 972-304-7019 From: Russell Bennett [mailto:rbennett@wadeconstructiongroup.com] Sent: Tuesday, January 14, 2014 10:35 AM To: Michael Garza Subject: 4 Points Hotel Coppell Mike, Wanted to introduce myself as the General Contractor for the above referenced project, and check status of a Site permit, as well as information for city permit and impact fees, utilities etc.? Looking forward to working with you on this project. Regards, Russell Bennett Wade Construction Group, Inc. #2 Horizon Court Heath, Texas 75032 972-746-4104 ext. 9 office 214-769-3428 cell 1 972-772-6801 fax rbennett@wadeconstructiongroup.com www.wadeconstructiongroup.com 2