Duke Lesley 2RC-CS140114
Rhonda Adloo
From:Michael Garza
Sent:Tuesday, January 14, 2014 4:47 PM
To:Russell Bennett; jdjr@jdjr.com
Cc:Rhonda Adloo
Subject:RE: 4 Points Hotel Coppell
Attachments:Construction Development Fillable.pdf; Duke Lesley 2RC-CS130809.pdf
Russell,
It looks like we approved plans back in August but never received a final submittal. Attached is the impact fee
assessment. The roadway impact fee was waived but the water and wastewater fees need to be paid at the time of
building permit. The construction development permit (civil site work) attached needs to be filled out and submitted
along with the inspection fees as stated on the last page of the permit. Once these inspection fees are paid we can set
up a pre-con.
Jim, can you send me a pdf of the plans so that I can take a look at them one last time before you submit final sets. We
will need 3 sets for our use and however many the contractor will need for construction.
If you have any questions, please contact me at your convenience.
Thanks,
Michael Garza, P.E.
Assistant Director of Engineering
City of Coppell
972-304-7019
From: Russell Bennett [mailto:rbennett@wadeconstructiongroup.com]
Sent: Tuesday, January 14, 2014 10:35 AM
To: Michael Garza
Subject: 4 Points Hotel Coppell
Mike,
Wanted to introduce myself as the General Contractor for the above referenced project, and check
status of a Site permit, as well as information for city permit and impact fees, utilities etc.?
Looking forward to working with you on this project.
Regards,
Russell Bennett
Wade Construction Group, Inc.
#2 Horizon Court
Heath, Texas 75032
972-746-4104 ext. 9 office
214-769-3428 cell
1
972-772-6801 fax
rbennett@wadeconstructiongroup.com
www.wadeconstructiongroup.com