Loading...
CF-Andrew Park 2-LR 920915ATEC Associates, Inc. 11356 Mathis Avenue Dallas, Texas 75229 (2~4) 556-2204 METRO 263-1681 FIELD DENSITY TESTS Project Name: Andre~ Brmm Park ATEC Job No.: 25-02-92-06928-0/~ CLient Job No.: Ctient #ame: Tony Crauford Const. Genera[ Contractor: Date: 9/15/92 Test No. Moisture % Dry Density Proctor X of Proctor Pass Fait Fail Elevation/ Location (PCF) No. ' .... Compaction Moisture Refer E.G. Grid Coordinates Spec Actual or Roadway Station 1 17.9 104.2 1677 95 96.9 X F.G. Bum, 25' N. * 10' ~. of end of Bum 2 16.4 107.2 1677 95 99.6 X F.G. Bum20'S + 12 E of N end of barn 3 17.6 108.2 1677 95 100.6 x 1st Lift 50' N + 40 E of N.W. Corner of Parking Lot 4 19.3 105.8 1677 95 98.3 X 1st Lift 30' ~ + 30'S of N.~. Corner of Parking Lot 5 18.8 104.3 1677 95 96.9 X 1st Lift IO0'S + 60'~ of N.~. Corner of Parking Lot 6 19.2 104.6 1677 95 97.2 X 1st Lift 60'~ + 10'5 of N.~. Corner of Parking Lot (1) Test Location Estabtished by: Grid Lines I----1 Controt Points I---]~ Estimation E~] Contractor r--] f2) Depth or E[ev. of Test Established by: Survey [] Grade StakesL-J Estimation I---1 Contractor [] 5) Test Conducted on: Fu[[ Time Basis I~ Intermittent Basis E~] Proctor No. Maximum Density (PCF) Opt. Moisture (~) Stand. Proctor Mod. Proctor Total Time: 2.0 1677 107.6 17.6 ~] [] [~ [] ATEC REPRESENTATIVE John Travis Refl~3rks: Respectfutty Submitted,